1-17 of 17
Keywords: rig site
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 8–12, 2021
Paper Number: SPE-204016-MS
... in the development of automated drilling technology. directional drilling upstream oil & gas real time system rig site automated directional drilling directional driller information platform drilling operation controller international association downlink automation controller personnel...
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 8–12, 2021
Paper Number: SPE-204124-MS
... 2D bit images taken at the rig site, and to quickly identify the root cause of bit damage and failure. A labelled dataset was first created whereby the damage seen in bit photos was associated with the appropriate root cause of failure. Particular attention was given to the radial position...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2018
Paper Number: SPE-189607-MS
... and directional steering was executed by the rig crew. drilling data acquisition Upstream Oil & Gas measurement while drilling rig site directional drilling process international association of drilling contractors MWD Directional Drilling remote well directional advisor software SPE Drilling...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184741-MS
... automation. The Operator embarked on a project to develop a powerful, low cost system in order to leverage both high and low frequency data to gain value from real-time data models and algorithms at the rig site. High frequency data is defined as 1 to 100 Hertz data frequency. Low frequency data is defined...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184743-MS
... interface. While multiple iterations may be needed before the enterprise workflow reaches a stable equilibrium, one does not have to wait until the end to reap the benefits. data quality information human factors rig site operation real time system workload Distribution System drilling...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184682-MS
... Abstract Given the recent advances in rig site communications and motor steering advisor software, directional drilling operations can now be directed by a directional driller in a remote operations center rather than at the rig site. This allows better utilization of expertise across multiple...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178808-MS
... were a fixed part of the bit. An innovative new feature enables compact element replacement and/or adjustments at the rig site using a mechanical locking design. The driller can quickly adjust the bit responsiveness before each run, if wanted, to optimize performance factors such as rate of penetration...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178873-MS
... environment. drilling operation rig site Directional Drilling wellsite ROC Engineer infrastructure ro engineer connectivity Implementation driller Upstream Oil & Gas communication responsibility rig vibration russia personnel crew 1 remote directional drilling ro job remote...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 1–3, 2011
Paper Number: SPE-140051-MS
... and the minimization of internal combustion engines brought the biggest value to the operation. drilling equipment high altitude spe iadc 140051 upstream oil & gas generator drilling operation management rig site engine geothermal reservoir drilling rig contractor chilean altiplano altitude rig...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 17–19, 2009
Paper Number: SPE-119297-MS
... impact (e.g. solid, liquid, and gas waste, footprint, etc.) and cost. These five technologies were (1) Low Impact Footprint, (2) Light Weight Rig/Casing Drilling, (3) Zero Waste from Rig Site, and (4) Alternate Rig Power. Each team evaluated two technologies. The number of teams allowed for each...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, March 4–6, 2008
Paper Number: SPE-112599-MS
... Major elements of the implementation process included: A pilot test to prove the concept and reassure the client that its promised advantages were both real and substantial. A full crew remained at the rig site during pilot testing as an extra measure of confidence in case unforeseen...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 19–21, 2003
Paper Number: SPE-79891-MS
... technology required is the SOIL network (fiber optic connectivity between onshore and offshore) and software which enables the real-time transfer of data from the rig site. This project was conceptualized in 1997 and began initial operations from a temporary Operation Service Center (OSC) in the year...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, March 3–6, 1998
Paper Number: SPE-39331-MS
... system promise rig site m* m.. society of Petroleum Engineers I lADC/SPE 39331 New Information Systems Promise the Benefits of the Information Age to the Drilling Industry D.A. Close, O. V. Stelly, M/D TOTCO, SPE Members IADC MembeB Copyright 1998, lADC/SPE Drilling Conference Tfds paper waa prepared...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, March 3–6, 1998
Paper Number: SPE-39382-MS
... and fully complements the overall safety objectives. P. 771 hset director incident contractor upstream oil & gas rig crew incentive proactive safety approach operational safety alaska safety performance goal program ladc spe 39382 rig contractor rig site human factors safety...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, March 12–15, 1996
Paper Number: SPE-35091-MS
... force safety, and medical/health aspects of the operation that consume as much, and sometimes more, effort than the drilling itself. kome base camp drilling operation safety meeting upstream oil & gas medical facility rainy season base camp operation basin incident rig site esso...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 28–March 2, 1995
Paper Number: SPE-29352-MS
... for the optimum makeup torque under cyclic loads for different material characteristics and suggests an operative patented method to estimate optimum makeup torques for connections directly at the rig site. Results are presented and discussed for different tool joint and drill collar connections. All conclusions...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, March 11–14, 1991
Paper Number: SPE-21900-MS
... operator acceptance efficiency responsibility incentive contract footage contingency incentive package completion drilling contractor day rate contract turnkey upstream oil & gas drilling operation management contract win situation rig site contractor Abstract...

Product(s) added to cart

Close Modal