1-3 of 3
Keywords: production section
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 5–7, 2019
Paper Number: SPE-194114-MS
... observed. MPD design for an optimized mud weight and surface backpressure schedule were utilized in the whole production section including for tripping and liner run operations. For the test well, a total of 9622ft of lateral was drilled for 7 days including casing run and cementing. Performance-driven...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178897-MS
... with oil based mud (OBM) to the Midway shale formation and 9 5/8" casing was run and cemented. Afterwards, an 8 ½" production section was drilled with OBM vertically to kick off point (KOP) at approximately 12,000-13,000 ft TVD, then the curve section was drilled landing in the Eagle Ford formation...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2012
Paper Number: SPE-151168-MS
... iadc spe 151168 production section rpd The Haynesville formation is an important shale-gas resource play in east Texas and northwest Louisiana ( Fig. 1 ). SWEPI LP (Shell Exploration & Production Company) began drilling in the Haynesville in 2008. This area represents several major...

Product(s) added to cart

Close Modal