1-9 of 9
Keywords: platform design
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2012
Paper Number: SPE-151403-MS
...-in.), the fatigue analysis may become the most important failure mode for both the conductor pipe body and the connectors. platform design platform conductor wall thickness casing design upstream oil & gas wave theory subsea system casing and cementing conductor stability fatigue analysis...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 1–3, 2011
Paper Number: SPE-139944-MS
... and cementing platform design Conductor axial force string 2 stiffness Upstream Oil & Gas displacement pinned-pinned strut Stahl interaction approximation fixity end condition axial load subsea system strut linear approximation assumption equation spe iadc 139944 string 1 sway...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 19–21, 2003
Paper Number: SPE-79825-MS
... system drilling equipment platform design upstream oil & gas cylinder elevator spe iadc 79825 wellhead disadvantage water depth conductor pipe Copyright 2003, SPE/IADC Drilling Conference This paper was prepared for presentation at the SPE/IADC Drilling Conference held in Amsterdam...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 22–25, 1993
Paper Number: SPE-25714-MS
... platform. Design of a skidbase and associated items for general use was already in progress and detail i ng and fabrication was then let to Dreco in Edmonton, Canada. The completed system is to be shipped to Holland for installation onto Magellan prior to Magellan's mobilization to the Everest platform...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, March 11–14, 1991
Paper Number: SPE-21980-MS
... platform design plattorm productivity upstream oil & gas subsea system elju drillstem/well testing galaxy 1 platform rig drilling equipment facility design wellhead platform installation drillstem testing semi-submersible tender spe iadc 21980 drilling operation drilling option...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, March 11–14, 1991
Paper Number: SPE-21982-MS
.... Shape factors were determined for the various configurations using the section model of the jack-up leg in a uniform air flow in a wind tunnel. P. 709 jack-up leg reynolds number platform design renumber subsea system circular cylinder drilling equipment wind tunnel chord shape factor...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, February 27–March 2, 1990
Paper Number: SPE-19981-MS
... of the cantilever. P. 603 noncantilevered jackup jackup unit platform design type jackup subbase layout drilling package skidbase slot area jackup spe iadc 19981 subsea system skidrail well location drilling equipment cantilever conversion perpendicular upstream oil & gas hull...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, February 9–12, 1986
Paper Number: SPE-14718-MS
... and wellhead permits easy access, at any time. This feature alone is sufficient to justify the use of a Gorilla Jack-up over floating rigs. P. 23 platform design drilling equipment subsea system wind velocity iadc spe 14718 new gorilla jackup deepwater rig gulf mexico water depth time...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, March 5–8, 1985
Paper Number: SPE-13424-MS
... sustained mean Drilling - 70K, gust 62K, one-minute sustained mean Wave height - 97' Current - 3.22K surface to 0.78K seabed Air Temperature - −15deg.C p. 23 requirement operation documentation regulatory bodies subsea system certification procedure platform design nmd...

Product(s) added to cart

Close Modal