1-10 of 10
Keywords: kickoff point
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 4–6, 2014
Paper Number: SPE-167982-MS
... unconventional shale play. Directional Drilling bearing housing stabilizer niobrara shale unconventional play geometry standard motor drill pipe selection curve section drilling operation stabilizer kickoff point iadc spe 167982 BUR capability exhibition Upstream Oil & Gas Niobrara shale...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 4–6, 2014
Paper Number: SPE-167988-MS
... Directional Drilling lateral cement plug Openhole System drill bit application operator deflector kickoff point Drilling Assembly Anchor iadc spe 167988 positive displacement motor hydraulically curve building Operators are now developing more complex and costly oil and gas plays...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, March 5–7, 2013
Paper Number: SPE-163534-MS
..., realized benefits to the operator, lesson learned and planned improvements going forward. drilling operation Directional Drilling Upstream Oil & Gas spe iadc 163534 hydraulically curve building kickoff point Anchor turbodrill landing point SPE IADC Drilling Conference pilot hole...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2012
Paper Number: SPE-150027-MS
... and (d) high pressure intervals. At greater depths, with elevated temperatures and pressures, cement plugs rarely have strength greater than the surrounding formation, making them difficult to use as a kickoff point. In highly deviated holes, cement plugs often get strung out along the wellbore. Without...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, March 12–15, 1996
Paper Number: SPE-35056-MS
... across the highest part of the reservoir. P. 165 directional drilling packer unconsolidated sandstone marrero iadc spe 35056 md sect assembly pipe vertical well horizontal well kickoff point completion gravel pack screen drilling operation horizontal section reservoir lateral...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, February 15–18, 1994
Paper Number: SPE-27462-MS
... illustrates the sidetrack process of a Prudhoe Bay field well. The focus of this paper will be on the sidetrack phase. drill pipe case study wellbore drilling operation section milling sidetrack program iadc spe 27462 cement plug section area orientation kickoff point kickoff plug plug...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 22–25, 1993
Paper Number: SPE-25745-MS
... IADC Members * SPE Members Abstract This paper presents a case study of a horizontal turnkey well in Southeast Texas. Figure 1 The drilling contractor had overall responsibility for the well, while the horizontal drilling company turnkeyed the directional services from the kickoff point...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference, February 18–21, 1992
Paper Number: SPE-23850-MS
... depth spe drilling engineering torque engineering application drillable depth inclination curvature buildup rate departure kickoff point upstream oil & gas reach well surface torque drilling operation displacement drilling conference tortuousity extended-reach capability 1992...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 28–March 3, 1989
Paper Number: SPE-18706-MS
... up to 3000' (914m). P. 725 upstream oil & gas drilling operation tangent section pipe angle-hold assembly long-radius lateral drilling wellbore short assembly medium-radius well build section kickoff point lateral drilling spe iadc 18706 build rate new development...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference, February 28–March 3, 1989
Paper Number: SPE-18715-MS
... the kill. equation kickoff point sidpp margin hold well hole inclination mob friction loss correction method original-weight mud kill-weight mud assumption omw underbalance drill pipe formation pressure pressure-volume schedule overbalance upstream oil & gas well control...

Product(s) added to cart

Close Modal