1-8 of 8
Keywords: connection time
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the IADC/SPE International Drilling Conference and Exhibition, March 3–5, 2020
Paper Number: SPE-199616-MS
... conducted by Mandava et al. (2017) on 170 wells drilled by 10 major operators in the Bakken between the first and third quarters of 2016, low rate of penetration and drilling and tripping connection times were identified as some of the major ILT sources with the highest potential for improvement...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2018
Paper Number: SPE-189607-MS
... direction and half were in the opposite (e.g. half +90°, half -90°), then the SEF would be 0. A good slide where all the toolface points fell within 20 degrees would have an SEF of approximately 98.5. SEF is independent of desired or effective toolface. Connection time KPIs provided feedback...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2018
Paper Number: SPE-189603-MS
... information data mining Upstream Oil & Gas performance report gross speed workflow Visualization iadc spe-189603-m rig team operational excellence pipe connection time dashboard operation Circulation Time performance improvement comparison report rig connection time real time fleet...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184694-MS
... rig automation vibration driller connection time automation system Permian Basin Process Controller As worldwide oil and gas reserves become increasingly difficult to explore, develop, and produce, the challenge for operators is accessing these reserves, producing them in the shortest...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178775-MS
... and for different operations, the overall comparison among the rig fleet wasn't feasible. Not only the efficiency comparison was challenging, but there was also a need for KPIs to measure gains and losses. Figure 1 Tripping connection time comparison with and without speed restriction One...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 17–19, 2015
Paper Number: SPE-173151-MS
... manipulator automation well delivery coststhrough practical experience new approach spe iadc-173151-m automate Drilling Equipment drill crew setup connection time international association of drilling contractors society of petroleum engineers efficiency Integral to achieving significant...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2012
Paper Number: SPE-151482-MS
... drill collar footage execution directional drilling operator iadc spe 151482 connection time drilling This paper is based on a study of more than 100 subsalt wells in the Gulf of Mexico (GOM); the wells are deeper than 20,000 ft and in water depth more than 4000 ft. IADC data has been...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, February 2–4, 2010
Paper Number: SPE-127687-MS
... drilling operation caesar-tonga well annual technical conference and exhibition upstream oil & gas salt entry vibration spe iadc drilling conference monitoring rotary steerable system drilling connection time information drilling dynamic tool rubble zone real time system international...

Product(s) added to cart

Close Modal