1-20 of 145
Keywords: completion
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 8–12, 2021
Paper Number: SPE-204127-MS
... mechanical downhole dynamic data has been primarily limited to the use of measurement-while-drilling (MWD) tools during drilling operations phase. However, the same downhole data provided by MWD tools would also provide valuable input for operational verification, planning, and diagnostics in the completion...
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 8–12, 2021
Paper Number: SPE-204097-MS
... oilfield chemistry machine learning production chemistry directional drilling high pressure high temperature completion heat transfer fracture complex reservoir renewable energy engineering application petroleum engineer reservoir characterization hpht drilling operation ashok...
Proceedings Papers

Paper presented at the IADC/SPE International Drilling Conference and Exhibition, March 3–5, 2020
Paper Number: SPE-199561-MS
... in the completion string and in the Christmas Tree of selected wells. Measurements during flow tests on these wells were thereby obtained. Our paper reports the results of a study that compares the temperature and pressure measurements from these wells with model predictions. Specifically, we compare APB...
Proceedings Papers

Paper presented at the IADC/SPE International Drilling Conference and Exhibition, March 3–5, 2020
Paper Number: SPE-199549-MS
... by leveraging on the capabilities of the new rig. Historically, the scope of operations in the field cuts across drilling, completions, well intervention, work over and abandonment. These operations have been executed with various rigs over the years. The two types of Mobile Offshore Drilling Units (MODUs...
Proceedings Papers

Paper presented at the IADC/SPE International Drilling Conference and Exhibition, March 3–5, 2020
Paper Number: SPE-199614-MS
... Abstract Wells in the Montney Formation area, British Columbia, Canada, were designed as monobores and include surface and long lateral production casings. The decision to modify the openhole (OH) completion to a cemented sleeve system presented some concerns. A comprehensive data set from all...
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 5–7, 2019
Paper Number: SPE-194182-MS
... wellbore are not considered in the drilling process. A standardized wellbore quality index has not been established yet. This work aims to narrow the gap between drilling and subsequent completion, production and plug & abandonment operations. The operator gathered large data sets to link wellbore...
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 5–7, 2019
Paper Number: SPE-194165-MS
... and implement one universal drilling system refered to as –IDIMS (Interface for Dual Intervention Mode System). IDIMS increases the operational response while lowering the intervention cost on this field. Indeed IDIMS allows one single rig to intervene, drill and complete with two different subsea production...
Proceedings Papers

Paper presented at the SPE/IADC International Drilling Conference and Exhibition, March 5–7, 2019
Paper Number: SPE-194082-MS
... Engineering completion Detournay drilling system society of petroleum engineers application estimation vibration equation torsional vibration This paper is an announcement to the oilfield industry and academia of the formation of an open source initiative to improve the rate of learning...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2018
Paper Number: SPE-189637-MS
... trouble-free with extraordinary reliability. In early 2016, a decision was made to add an additional well (Tamar 8) to the existing well stock. Accelerated well planning was conducted thereafter in order to be ready for a completion start date of December 1, 2016. The completion design...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2018
Paper Number: SPE-189664-MS
... The case study presented in this work applies the new dynamic stress model with friction to a real-world well design. The scenario is an actual installation of a single trip, multizone completion in an offshore highly deviated ERD well. In extended-reach wells as the laterals get longer and more...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 6–8, 2018
Paper Number: SPE-189644-MS
... are between 215 to 330°F with laterals lengths ranging from 2,500 to more than 6,000 ft. Challenges exist in terms of successful execution of a casing-in-casing refracturing. Contrary to the bullhead style where most of the complications are experienced on the completion design of the treatment...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184603-MS
... on deformations, fracture gradient, breakout and breakdown mud weights were generated for mitigation of drilling hazards at field scale rather than the more traditional well-by-well analysis. Further numerical simulations of the completion well casing and cement provided well operability risk. The magnitude...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184629-MS
... Intelligent Completion installations provide the capacity to reduce surface footprint while allowing efficient reservoir drainage thereby proving the repeatability of both Extended Reservoir Contact (ERC) and Maximum Reservoir Contact (MRC) Multilateral (ML) technologies for reservoir development...
Proceedings Papers

Paper presented at the SPE/IADC Drilling Conference and Exhibition, March 14–16, 2017
Paper Number: SPE-184608-MS
... Abstract Since 1996, more than 260 multilateral junctions have been installed in Norwegian Continental Shelf (NCS) fields; currently, 25 laterals are completed annually. This paper discusses a TAML Level-5 multi-branch multilateral system that was installed in Troll field in 2012. It is now...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178812-MS
... longer reach wells. Fig. 3 shows the flow chart of the project drilling and completion operations sequence. Courses on ERD design and implementation were provided to the drilling and completion team and a Drill the Well on Paper (DWOP) exercise was conducted prior to starting each well, which proved...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178850-MS
... compelling in the drilling and completion business given today's very challenging financial environment. A drilling manager whose drilling team moved from 250 feet per day to 1650 feet per day over 4 years observed that had his team realized initially how large the opportunity was they would have used a far...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178905-MS
... Bellarby (2009 ) provides a detailed and authoritative compendium on the main challenges of completion design. Among these design challenges, the potential criticality of drag effects on the initial conditions of tubing strings is highlighted, particularly in extended-reach applications...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178859-MS
... Abstract Current Extended Reach Drilling (ERD) well technology limits the well lengths to roughly 12 km with a horizontal departure of approximately 10 km. This paper presents a concept that enables simultaneous drilling and completion with an aim to substantially extend well reach...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178878-MS
... Figure 3 South Lokichar crude oil at ambient conditions. Each of the five wells was completed with a five zone intelligent completion whose principal design components will be discussed in detail. The operational sequence of the overall extended well test programme was to perform clean...
Proceedings Papers

Paper presented at the IADC/SPE Drilling Conference and Exhibition, March 1–3, 2016
Paper Number: SPE-178780-MS
... was above the threshold of H 2 S embrittlement) to surface to protect the existing 5 1/2-in. 20 ppf P-110 casing. The internal D-diameter (ID) of the completion changed from 4.778 in. (original production casing size) to 4.140 in. (once the pipe was expanded). The well was then completed with 2 3/8...

Product(s) added to cart

Close Modal