1-3 of 3
Keywords: retrievable bridge plug
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference and Exhibition, March 27–28, 2012
Paper Number: SPE-153808-MS
... twenty gallons (75.70 L) of inflation fluid within twelve 3-½" (88.9 mm) OD fluid chambers located along the toolstring in order to inflate and set the retrievable bridge plug. The client provided 105 feet (32 m) of lubricator and two cranes in order to perform a safe rig up of the 94 feet (28.65 m) long...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference and Exhibition, March 31–April 1, 2009
Paper Number: SPE-121548-MS
... Abstract Monobore completions are an efficient way to exploit multilayer reservoirs. During the life of a field, targeted layers can be either opened or closed in order to optimize hydrocarbon production and avoid undesirable fluid entry. For these cases, nippleless retrievable bridge plugs...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing Conference & Exhibition, April 4–5, 2006
Paper Number: SPE-99360-MS
... the well. downhole intervention production enhancement bridge plug inflatable element coiled tubing Completion Installation and Operations fluid reservoir system retrievable bridge plug assembly subsea system through tubing well intervention isolation objective plug subsea production...

Product(s) added to cart

Close Modal