1-20 of 84
Keywords: reservoir
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218358-MS
... string require to control fluid losses to the reservoir or to install a mechanical barrier to isolate the reservoir. The team evaluated that both options had high risk of not delivering the expected results. The proposal was to remove the completion string in a single trip, sustaining losses...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218347-MS
... production enhancement subsea system package downhole intervention operation drilling equipment nigeria rigless intervention shell nigeria exploration society recovery bonga deepwater petroleum engineer lubricator barrier package well intervention well control package reservoir...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218353-MS
... due to solid content and/or scale, and characteristics of the reservoir itself. Pressure Transient Analysis (PTA) further validates significant skin and permeability reduction. To improve the injection rate, workover activities are conducted on the targeted well using a combination of the Acidizing...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218354-MS
... Abstract The evolution of horizontal drilling methodologies and subsequent completion strategies has successfully tackled numerous reservoir access hindrances. As the industry leans towards optimal operational expenditure and the augmentation of reserve extraction via amplified reservoir...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218304-MS
... Abstract Adaptive tension limits for the winch control system in automated wireline and slickline operations with backspool and slack controls are presented. The design addresses safety and access challenges for gravity conveyance that are exacerbated in complex reservoirs (deviated or tortuous...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218333-MS
... oil company which wanted to access a new and untapped section of a reservoir. This operation required passing through a 3.877" ID production tubing, featuring a landing nipple with a 3.562" ID, and drilling a new sidetrack from an existing deviated wellbore. Coiled Tubing Drilling (CTD) was the only...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 21–22, 2023
Paper Number: SPE-212929-MS
... Oil-bearing productive intervals are stratigraphically divided into Balakhany and Fasila reservoirs. Pressure and log evaluation on this formation confirmed the complexity of fluid flow. Therefore, commingled production from both Fasila and Balakhany formations has been eliminated and dedicated...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 21–22, 2023
Paper Number: SPE-212916-MS
... enhancement cable united states government well intervention prototype cable intervention conveyance strength table 2 upstream oil & gas directional drilling conveyance construction application reservoir gravity deployed well intervention conveyance drilling operation downhole intervention...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 21–22, 2023
Paper Number: SPE-212920-MS
... Screen slot sizing was done using sand retention testing on screen coupons. Various representative samples from different target reservoir sands have been studied on their particle size distribution ( Table 2 , Figure 4 ) to date and used in sand retention test to determine an optimum slot...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–25, 2021
Paper Number: SPE-204436-MS
... implementation of the CTUBD technique. This paper describes the four milestones of the feasibility study starting with identified candidate reservoirs were screened for the applicability of CTUBD techniques. Then a detailed well engineering work was performed in this phase to develop the drilling plan...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–25, 2021
Paper Number: SPE-204425-MS
... drilling friction intervención de pozos petroleros well intervention generation run upstream oil & gas stimulation treatment ct string application horizontal well reservoir hdat frictional force wellbore objective hydraulically driven agitation tool petroleum engineer target depth...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–25, 2021
Paper Number: SPE-204402-MS
... oil & gas intervention technique artificial intelligence owir deployment completion installation and operations optimization functionality marine riser requirement reservoir application access point modu configuration operator hydraulic access iwoc Introduction...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199819-MS
... The field is a mature field and has been on production since 1994. The reservoir is a layered sandstone reservoir with multiple pay zones. It a sand-shale-and type and under depletion drive with very weak/nil aquafer support. The target layer in this article is layer A, which holds significant...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199837-MS
... management quick connection check valve Upstream Oil & Gas packer case study connector CT string pipe ram reservoir Drillstem Testing drillstem/well testing spoolable connector BHA pressure testing retrieval Production Chemistry Drilling Equipment Corrosion Management valve gas well...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199866-MS
... reason. In order for a LWIV to install a reservoir abandonment cement plug, a TTA cement plug must be installed. An LWIV does not have the ability to recover large lengths of production tubing and rotate pipe like a typical MODU, therefore the reservoir abandonment plug must be installed...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 26–27, 2019
Paper Number: SPE-194249-MS
... – Integrity of slotted liner – Inefficient wellbore cleanouts during interventions – Improper well trajectory – Variation in reservoir quality – Formation damage that may have occurred in some wells that were drilled and completed with overbalanced fluids – High dogleg...

Product(s) added to cart

Close Modal