1-3 of 3
Keywords: qualification
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 26–27, 2013
Paper Number: SPE-163898-MS
... the system. This paper describes the different stages of this qualification process including the laboratory procedures that have been developed especially for this application, explains the sealant selection criteria and the field qualification of both the CT cement-filled reservoir and the...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 23–24, 2010
Paper Number: SPE-130427-MS
... hydraulic control line. A prototype valve was subjected to qualification and functionality testing in accordance with a modified ISO 10432 test procedure. This testing was followed by installation in an onshore gas well for a 6 month trial that involved both flowing and injection phases. The valve was...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 23–24, 2010
Paper Number: SPE-130633-MS
... (ISO 10423), API 16A (13533), API RP-17G (ISO 13628-7) and draw attention to what is required for a subsea well intervention coiled tubing/wireline BOP rams. I will go through some of the qualifications that have been performed for some products, difficulties and challenges with certain sections and...

Product(s) added to cart

Close Modal