1-5 of 5
Keywords: intervention vessel
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 24–25, 2015
Paper Number: SPE-173687-MS
... drilling or workover rig. This process uses a light well intervention vessel (LWIV) complete with a moonpool located mid-deck for open-sea access, a riserless pressure control package typically involving remotely operated vehicles (ROVs), and a combination of conventional slickline and electric line...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference and Exhibition, April 5–6, 2011
Paper Number: SPE-143371-MS
... Abstract A UK North Sea operator presented a challenging opportunity for the development of a contingency recovery system to be designed for deployment from an intervention vessel. The main requirement of the contingency tool was that it be capable of recovering coiled tubing...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 23–24, 2010
Paper Number: SPE-130522-MS
... into a more dynamic market from a light well intervention vessel with a stiff riser solution. This paper will explain how the use of coiled tubing and wireline in a much more effective way on subsea wells will increased the income of the operating companies, increase the use of known technology on wells...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 23–24, 2010
Paper Number: SPE-130688-MS
... Abstract Deep water and ultra deep water intervention of wet trees has been a huge challenge for oil and gas producers. Currently, the only realistic way to do intervention is to use a conventional Mobile Offshore Drilling Unit (MODU) or intervention vessel (which is usually a smaller MODU...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 20–21, 2007
Paper Number: SPE-106840-MS
... automatically without further intervention. In this paper, the authors will review the decision-making process that led to the re-completion, discuss installation planning and execution, and present the results achieved with this unique completion that was installed using an intervention vessel...

Product(s) added to cart

Close Modal