1-6 of 6
Keywords: drilling rig
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 27–28, 2018
Paper Number: SPE-189918-MS
... in composites. DET CRC built a new rig as part of a transformational solution to decrease drilling exploration costs. More specifically DET CRC set the ambiguous objective to develop and build a Coiled Tubing Drilling Rig (CT Rig) for greenfields mineral exploration drilling at a cost of $50/metre...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference and Exhibition, April 5–6, 2011
Paper Number: SPE-143339-MS
..., the potential for increased well intervention work, and focus on what we can do to make this happen. The paper will present solutions for well intervention from existing well head platforms with or without drilling rigs, and for subsea wells. For existing platforms with drilling rigs, the potential for working...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 23–24, 2010
Paper Number: SPE-130522-MS
... Abstract The paper will discuss the introduction of a new method of completing wells whilst reducing the amount of time spent by rigs on each well drilled. The information presented in the paper will enable operating companies to rethink their way in which they use their drilling rigs...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing Conference and Exhibition, April 12–13, 2005
Paper Number: SPE-94039-MS
... spe 94039 directional drilling horizontal section drilling rig alpine field completion horizontal wellbore upstream oil & gas conocophillips alaska inc alaska supervisor tank completion installation and operations petroleum engineer society coiled tubing blount long horizontal...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing Conference and Exhibition, March 23–24, 2004
Paper Number: SPE-89636-MS
... cement property plug spe 89636 pdo procedure christmas tree perforation requirement abandonment operation casing and cementing ct unit well abandonment coiled tubing cement formulation upstream oil & gas drilling rig reservoir cement plug isolation cement chemistry...

Product(s) added to cart

Close Modal