Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-15 of 15
Keywords: consideration
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Recovery of Stuck Telemetry Coiled Tubing Utilising Downhole Severance Methodology
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 25–26, 2025
Paper Number: SPE-224040-MS
... The afore mentioned functions can elevate the accuracy and predictability of CT operations. As such, if operational complexity dictates, it can be seen as beneficial to run telemetry based CT strings for certain operations. While this setup can bring many benefits, some additional considerations...
Proceedings Papers
Subsea Well Annular Integrity Repair Using Coiled Tubing and Pressure Activated Sealant
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 21–22, 2023
Paper Number: SPE-212925-MS
... operations leak united states government subsea production equipment pressure activated sealant information consideration assembly application petroleum engineer communication society Introduction Under federal regulation per reference 30 CFR Part 250 Subpart E, governing well operations...
Proceedings Papers
Smart Intervention Restores Production in Deep Water Well
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–23, 2022
Paper Number: SPE-209029-MS
... string consideration completion installation and operations upstream oil & gas flow area presentation indication assembly smart intervention restore production restriction operator im1 field engineer Introduction Commodity prices and market forces have pushed operators and service...
Proceedings Papers
Successfully Adapting and Overcoming Challenges for Coiled Tubing Applications in High-Pressure Sour Environment and Horizontal Unconventional Tight Gas Wells in UAE
Available to PurchaseOle Sorensen, Yang Wu, Didier Caillon, Bjorn Viguerie, Rao Shafin Ali Khan, Nestor Molero, Ernesto Franco Delgado, Mohamed Fahim Ahmed, Rafael Fernando Mattos, Anna Gilash, Muhammad Talha Khan, Irma Galvan, Garry McClelland
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–23, 2022
Paper Number: SPE-209032-MS
... The selection of the CT string design has a significant impact on other equipment choices, project logistics, and overall costs. Hence, it is an essential part of any CT operation feasibility assessment. General considerations were part of the string design process which embraced robustness...
Proceedings Papers
Visual Analytics: Improving Wellbore Diagnostics with Integrated Video Caliper Datasets
Available to PurchaseSaad Hamid, Nahr Abulhamayel, Abdullah Alduraihem, Omar Alhindas, Glyn Roberts, Michael MacDonald, Tobben Tymons
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–23, 2022
Paper Number: SPE-209003-MS
... and operations wellbore integrity production enhancement information wellbore design objective pup joint assessment well intervention upstream oil & gas log data consideration artificial intelligence application wellbore diagnostic deformation video caliper drilling operation inspection...
Proceedings Papers
The True Value of Open-Water Hydraulic Access Using Coiled Tubing
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199818-MS
... Installation and Operations Upstream Oil & Gas intervention subsea well requirement utilization conventional ct riser consideration hydraulic access hydraulic intervention Efficiency assessment application open-water hydraulic access investment stimulation owha reeler Scenario drilling...
Proceedings Papers
Subsea-Pipeline Intervention With Coiled Tubing From a Supply Vessel
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference and Exhibition, March 31–April 1, 2009
Paper Number: SPE-121491-MS
... tool string consideration winch Coiled tubing operations intervention CT string pressure limit Completion Installation and Operations platform subsea-pipeline intervention injector head Upstream Oil & Gas supply vessel pipeline restriction Schlumberger society of petroleum engineers...
Proceedings Papers
Coiled-Tubing Milling of an Incoloy Alloy 925 Safety Valve Flapper in the North Sea
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 20–21, 2007
Paper Number: SPE-107096-MS
... recovery. Consideration of the material properties and the location of the fish indicated that milling could be challenging. Reported industry experience of similar operations was sparse and BHA selection and job design required very close co-operation between the operator, coil tubing and through tubing...
Proceedings Papers
Successful Coiled Tubing Water Shutoff Solution for a Horizontal Sand Screen Completion Using Novel Fluids
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Conference and Exhibition, April 12–13, 2005
Paper Number: SPE-94175-MS
... upstream oil & gas water shutoff solution completion installation and operations personnel zonal isolation material directional drilling consideration downhole intervention horizontal sand screen completion spe 94175 coiled tubing operations centrica resource ltd society of petroleum...
Proceedings Papers
Coiled Tubing Operations from a Floating Anchored Vessel
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Conference and Exhibition, April 8–9, 2003
Paper Number: SPE-81714-MS
..., technicalities, considerations, and constraints of performing a coiled tubing operation from an anchored vessel. The 15 treatments performed up to the present have been analyzed, highlighting the lessons learned, technical achievements, future developments, and main points that differentiate this operation from...
Proceedings Papers
Considerations on the Selection of an Optimum Vertical Multiphase Pressure Drop Prediction Model for Oil Wells
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Roundtable, March 7–8, 2001
Paper Number: SPE-68361-MS
... calculation production monitoring multiphase flow modeling & simulation calculation model fluid dynamics spe 68361 multiphase pressure drop prediction model correlation pressure drop calculation model consideration pressure drop prediction model flow pattern pressure drop correlation...
Proceedings Papers
The Development of a Light Well Intervention Ship
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Roundtable, April 5–6, 2000
Paper Number: SPE-60729-MS
... to grow. Coiled tubing as a means of well intervention has matured considerably over the last five years with coiled tubing performing operations that previously would have been the preserve of workover rigs or hydraulic workover units. These two developments lead to the inescapable conclusion...
Proceedings Papers
Selective Hydraulic Fracturing of Multiple Perforated Intervals with a Coiled Tubing Conduit: A Case History of the Unique Process, Economic Impact and Related Production Improvements
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Roundtable, May 25–26, 1999
Paper Number: SPE-54474-MS
... stimulating more than one zone of interest. completion installation and operations fracture treatment application multiple perforated interval consideration stimulation conventional stage upstream oil & gas coiled tubing operations spe 54474 economic impact wellbore coilfrac case...
Proceedings Papers
The Reeled Monodiameter Well
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Roundtable, May 25–26, 1999
Paper Number: SPE-54508-MS
... expandable tubulars and bring them to the market place. Consideration of the whole package reveals that there are various ways of achieving the end objective as described in this paper. There are still key technological challenges, notably in the areas of expandable casings, annular isolation techniques...
Proceedings Papers
Through-Tubing Inflatables: Isolation and Guidelines for Coiled-Tubing Applications
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Roundtable, May 25–26, 1999
Paper Number: SPE-54476-MS
... Abstract When planning a well intervention, there are many factors that need to be taken into consideration prior to the execution of the operation. The operator has many tasks to perform before the actual job and the last thing he or she wants to worry about is "Have I chosen the right...