1-4 of 4
Keywords: cleanout run
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–25, 2021
Paper Number: SPE-204414-MS
... production enhancement coiled tubing telemetry system concentration ttirp 1 cleanout run The well was initially completed as water injector in June 2008 but in April 2012 was recomplete as producer from upper sands. Starting Q3 2017, GOR increased rapidly which resulted in an oil rate decline...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–25, 2021
Paper Number: SPE-204440-MS
... As per the plan, a cleanout run was carried out with a 2 7/8" OD nozzle assembly. Details of the cleanout run are shown in Figure 3 . Figure 3 Run #1 - Cleanout Run with 2 7/8 in OD Nozzle Since the cleanout run was a success, the original plan was modified to skip the camera run...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 26–27, 2019
Paper Number: SPE-194259-MS
... lockup well logging lockup depth Reservoir Contact assembly tractor speed RIH ERW log analysis cleanout run society of petroleum engineers artificial intelligence minimum id restriction Extended reach wells (ERW's)are unique engineering-based projects that account for drilling and...
Proceedings Papers

Paper presented at the SPE/ICoTA Coiled Tubing Conference and Exhibition, April 12–13, 2005
Paper Number: SPE-94131-MS
... cleanout run fracturing fluid efficiency ct speed conventional practice nozzle proppant cleanout process optimization cleanout procedure wellbore procedure optimized process completion installation and operations fracturing materials concentration process optimization optimization upstream...

Product(s) added to cart

Close Modal