Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-5 of 5
Keywords: chemical cutter
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 25–26, 2014
Paper Number: SPE-168270-MS
... the project's challenges allowing time and cost reductions. Colombia Pipe Recovery reduction real time system cement plug application spe 168270 Upstream Oil & Gas plug slickline Completion Installation and Operations chemical cutter ballena 04 chevron well ballena 4 schlumberger...
Proceedings Papers
Zacarias Guimaraes, Robledo Barros, Cicero Franca, Filipe Costa, Wyvis Camargos, J. Alexander Gerena, F. Raulino, Afonso Henrique, Vitor Ponte, J. Marcelo Teles, Necesio Costa
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference and Exhibition, March 31–April 1, 2009
Paper Number: SPE-121671-MS
... wireline chemical cutters, string shots and thru-tubing tools with elastomer rubbers was not possible due to the high bottom hole temperature of the well (363 °F). With this scenario, the solution was to use coiled tubing in order to cut the string above the free point. The first challenge for this coiled...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference and Exhibition, March 31–April 1, 2009
Paper Number: SPE-121349-MS
... of the challenges encountered was the ability to pass tools, such as chemical cutters. Finite Element Analysis (FEA) has been used to allow quick design changes and verification to permit custom applications, such as larger inside diameter (ID). Physical tests, such as the fatigue machine test with pressure...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Conference & Exhibition, April 4–5, 2006
Paper Number: SPE-100168-MS
... to recent experience with CT- conveyed wireline tools in open hole. log analysis Reservoir Characterization formation testing Coiled tubing operations circulation tool string chemical cutter deployment Completion Installation and Operations deviation objective well logging Upstream Oil...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing Conference & Exhibition, April 4–5, 2006
Paper Number: SPE-99917-MS
... derived from the interventions will be discussed. zonal isolation Completion Installation and Operations knowledge management Well Intervention Upstream Oil & Gas upper knuckle joint chemical cutter assembly Coiled tubing operations completion equipment chrome diameter well integrity...