Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 46
Keywords: bridge plug
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
R. J. Garay Cuesta, A. E. Rodriguez, A. Ramirez, N. Mesa, C. Perez, J. M. Palacios Bayona, A. Orozco
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218319-MS
...) and cement integrity evaluation. A diagnostic run was then performed to identify internal and external casing wear, erosion, corrosion, and mechanical damage to determine the optimal bridge plug setting depth according to lithological seals. With the bridge plug set, a tubing punch was used to create a flow...
Proceedings Papers
Emin Jafarov, Yoliandri Susilo, Farid Agayev, Aydan Mikayilova, Nadir Gafarov, Imran Guliyev, Matin Allahverdiyev, Ilkin Guliyev, Teymur Sadigov, Zahid Hasanov, Ahad Pashayev, Turan Eyyubbayli
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218341-MS
... erosion resistance to cope with high flow rates and GOR in ACG wells. Three thru-tubing sand control remedial works using ceramic screen has been trialed successfully, both inside C&P well and high angle OHGP wells with unpacked section at the toe which previously isolated by bridge plug. The ceramic...
Proceedings Papers
R. H. Pereira, C. Cisneiros, E. Schnitzler, I. M. Sales, N. J. Armani, R. L. Almeida, R. Roman, R. S. Rosa, W. M. Ascaneo
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218358-MS
... undesired production from the lower zone, it was decided to install a High-Expansion Plug (HEP) above the ICV and below the cut point to increase the reliability of the seal in the lower zone. The HEP is a permanent bridge plug set via wireline in any section of the string with the appropriate diameter...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 21–22, 2023
Paper Number: SPE-212932-MS
... government completion installation and operations production monitoring bha restriction bridge plug aid complex well recompletion operator sensitivity cleanout circulate calculation coiled tubing utilized exhibition cleanout efficiency production control wellbore software comparison...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 21–22, 2023
Paper Number: SPE-212933-MS
... section isolation and fluid communication between section A and B: two bridge plugs were set on Wireline (WL) at the curve (40° / 2,950 m) to generate a downhole pressure barrier between frac stimulated well section and wellhead. Fresh water was pumped from wellhead A section to B section, and effective...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 22–23, 2022
Paper Number: SPE-209036-MS
... inflatable retrievable bridge plug system, for diversion, along with a bismuth-based metal-to-metal sealing alloy actuated by means of a thermite heater. This unique solution included drilling the tubing above the production packer with an e-line deployed system to provide multiple communication ports...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199866-MS
... system oilfield chemistry well decommissioning casing and cementing scale remediation remediation of hydrates bridge plug operation asphaltene inhibition cable fluid return abandonment operation agitator tool mobilisation intervention plug reservoir Production Chemistry Drilling...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 24–25, 2020
Paper Number: SPE-199867-MS
... completed without any progress being made operations were suspended and Bridge Plug was set to secure the well. completion equipment task launcher workover flow tube drilling operation bridge plug wireline technique slickline Novel Approach retrieve plug society of petroleum engineers SSSV...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 26–27, 2019
Paper Number: SPE-194237-MS
... casing string or inserted into the production casing string during the fracture stimulation. In the Montney, the method of ′′plug-and-perf′′ has been the predominant method of isolating stages. The method utilizes highly drillable bridge plugs pumped down and set on wireline followed by explosive jet...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 22–23, 2016
Paper Number: SPE-179088-MS
... wellbore clean outs and reduce the number of wiper trips. Secondly, the test will analyze how set down force of the drilling tool affects the ROP on the bridge plug. One specific type of 4-1/2″ bridge plug with a combination of selected mills and bits will be studied in this paper to control the experiment...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 22–23, 2016
Paper Number: SPE-179056-MS
... & Gas CT string injector head upper abandonment riserless operation service company operator abandonment wellbore bridge plug personnel riserless upper abandonment Introduction As of 2010 the riserless upper abandonments were being performed by workover rigs, however as the service...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 24–25, 2015
Paper Number: SPE-173690-MS
... with an average cut of 50 ft. The HWO fishing procedures consisted of 541 hours without any health, safety, or environment (HSE) incidents, accidents, injuries, or job failures. downhole intervention production enhancement bridge plug well control equipment Drilling Equipment BOP stack Well...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 24–25, 2015
Paper Number: SPE-173668-MS
... treatment has been completed, the bridge plugs or ball seats are subsequently milled out via the use of coiled tubing (CT). During the plug or ball-seat milling phase, it is difficult to control weight-on-bit at the end of the CT. If the injector releases too much weight at surface, then the weight-on-bit...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 24–25, 2015
Paper Number: SPE-173693-MS
... CT operation milling operation pilot hole operation cement property Coiled tubing operations bridge plug closed-loop system operator diesel ct milled abandonment perforate cement plug RIH ExxonMobil cement plug CT string assembly management system society of petroleum engineers...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 24–25, 2015
Paper Number: SPE-173671-MS
... Abstract Coiled tubing (CT) is one of the most common and effective methods employed to mill out composite bridge plugs (CBPs) that are used to isolate zones during completion. Typically, the zones are normally pressured or over pressured, i.e., each interval approximately the same pressure...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 25–26, 2014
Paper Number: SPE-168263-MS
... to comply with the updated regulations. All of these wells have surface plugs (either cement plugs or cast iron bridge plugs) that require milling in order to access the wellbores to be abandoned. The use of a pulling unit is generally the method used for these abandonment operations. However, the risks...
Proceedings Papers
K. V. Burdin, R. N. Mazitov, P. V. Bravkov, D. A. Serikov, V. N. Klimenko, V. Zhuk, A. S. Golovanev, A. A. Potryasov, V. N. Kovalev, R. R. Yunusov
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 25–26, 2014
Paper Number: SPE-168288-MS
... delivery of working fluids, costs optimization and errors elimination detailed pumping schedule was made with a glance of CT volume. To prevent damage to the other productive parts of the horizontal well two inflatable bridge plugs were used. The diameter of plugs makes it possible to go through...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 26–27, 2013
Paper Number: SPE-163904-MS
... Upstream Oil & Gas bridge plug bead wellbore tag depth asphaltene remediation asphaltene inhibition field application solids-control unit offshore well abandonment society of petroleum engineers Drilling gelled fluid main objective completion equipment tank surface-controlled subsurface...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 26–27, 2013
Paper Number: SPE-163898-MS
... expanding cement slurry, and, finally, reviews a case history. cement formulation cement chemistry Completion Installation and Operations downhole intervention production enhancement casing and cementing long-term isolation field test bridge plug inflatable bridge plug isolation water...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition, March 26–27, 2013
Paper Number: SPE-163935-MS
... water use significantly through the application of this method without compromising treatment volumes or stimulation design parameters, while still achieving all of the original completion objectives. isolation assembly Completion Installation and Operations bridge plug plug Upstream Oil...
1