1-20 of 144
Keywords: bha
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 25–26, 2025
Paper Number: SPE-224034-MS
..., questions arise when trying to get tools into or out of a well that are longer than the available lubricator length, which can also be an issue during fishing operations. Figures 1 & 2 show typical CT rig ups on a well with the available BHA length shown as the length between the stripper...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 25–26, 2025
Paper Number: SPE-224040-MS
... operations. When completing work scopes, the minimal OD of the conductor wire does not interfere with operations, either hydraulically or through additional weight. However, when CT recovery is required, the presence of the conductor wire can be detrimental. To this end, if CT is stuck above the BHA...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 25–26, 2025
Paper Number: SPE-224046-MS
... Abstract On most coiled tubing (CT) operations there is a risk of becoming stuck-in-hole. This can happen for many reasons and results in increased intervention costs, delayed production, loss of CT pipe, loss of bottom hole assembly (BHA), and in the worst-case the loss of a well. This paper...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 25–26, 2025
Paper Number: SPE-224060-MS
...-time downhole force data from a tension and compression sub in the bottom hole assembly (BHA) with surface acquisition systems. Unlike traditional methods that estimate downhole forces from surface weight data, often skewed by varying friction coefficients, this system directly uses downhole...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 25–26, 2025
Paper Number: SPE-224073-MS
... of the packers were the CT string configuration, well conditioning and BHA. Considering that the core of the intervention depended not only on the ability to deliver shifting force (28-klbf) to packers set at depths with ~35-degree and ~85-degree, but also the ability to apply higher shifting force (42-klbf...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218322-MS
... upwards of 17% savings compared to the alternative. Bottom Hole Assembly (BHA) selection, solids control, and fluid system management played a vital role in the cement drillout portion of the workover. Rates of penetration of up to 85 ft/hr were achieved and maintained throughout the job. In total...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218325-MS
... and operations assembly artificial intelligence coiled tubing operations real time system drillstem/well testing drillstem testing downhole intervention bha wellbore correlation cleanout ct perforation gun extended-reach well challenge petroleum engineer intelligent coiled tubing gr-ccl debris...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218349-MS
... expectations of technology that will aid the operating companies’ goals. operator operation injector coiled tubing operations bha software completion installation and operations incident warning real time system service delivery well intervention conference pipe baker hughe gauge limit...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218323-MS
..., given the challenging situation of the fish being stuck. The selection of such thick wire required a special sour service rotary cable cutter as a contingency option should the 7/16-in. braided line get stuck in the BHA. Additionally, the surface PCE needed to accommodate both the 7/16-in. braided line...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218345-MS
... that measures the axial force acting on the BHA. These measurements can be correlated with the real-time measurements provided by the CT downhole measurement system to confirm the effectivity of the intervention. The system has three primary modes that can be controlled using a dynamic interpretation...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218371-MS
... Power and telemetry are provided to the BHA with a hybrid electro-optical cable system ( Fig. 2 ). A computer inside the CT cabin controls a DC power supply and sends telemetry data to an electrical-to-optical converter. The electrical-to-optical converter consists of a photo diode that receives...
Proceedings Papers

Paper presented at the SPE/ICoTA Well Intervention Conference and Exhibition, March 19–20, 2024
Paper Number: SPE-218368-MS
... of these wells, slickline (SL) was being used to remove scale using a bailer when the Bottom Hole Assembly (BHA) got stuck and lost in the well. The wire was pulled to 70% of its breaking strength of 2150 lb with no indication of the SL jar firing. The fish left in the wellbore was a 37 ft long tool consisting...

Product(s) added to cart

Close Modal