Abstract
Deployment of long tool strings is often critical for economical intervention in horizontal wells. This is because the extensive exposure to the reservoir produces a corresponding requirement for long perforation and straddle intervals.
A Norwegian operator has faced this challenge to increase recovery from horizontal offshore wells. Deployment of long tool strings into live wells can be a challenging task. When using the down-hole safety valve (DHSV) as the primary well barrier, the operator has only accepted snubbing as conveyance method. Deployment against DHSV on Coil Tubing (CT) and Wireline (WL) has not been accepted in live wells.
Copyright 2006, Society of Petroleum Engineers
You can access this article if you purchase or spend a download.