1-7 of 7
Keywords: cement and bond evaluation
Close
Sort by
Proceedings Papers

Paper presented at the SPE Norway Subsurface Conference, April 17, 2024
Paper Number: SPE-218448-MS
... and cementing well logging cement formulation interface impedance setup mrayl bonding casing-cement interface cycling cement and bond evaluation cement property experiment presented conference cement-casing interface loading exposure imaging cement-casing bonding engineering defect...
Proceedings Papers

Paper presented at the SPE Norway One Day Seminar, May 14, 2019
Paper Number: SPE-195607-MS
... a mobile offshore drilling unit. If cement integrity or isolation could be determined without removing the production tubing, operational time and costs would be significantly reduced. Hence, multi-string cement bond evaluation for isolation verification without pulling the tubing has been desired...
Proceedings Papers

Paper presented at the SPE Norway One Day Seminar, April 18, 2018
Paper Number: SPE-191315-MS
... optimization problem wellsite well control annular pressure drilling drill pipe well abandonment complexity operation innovative approach subsea well cement and bond evaluation Upstream Oil & Gas RLWI vessel operational sequence complexity Scenario coiled tubing perforate time estimate...
Proceedings Papers

Paper presented at the SPE Bergen One Day Seminar, April 5, 2017
Paper Number: SPE-185911-MS
... perforated interval cement and bond evaluation Upstream Oil & Gas tool assembly hydrawell technology cement bond log high annulus-b pressure remediation technique integrity casing design cement perforation perforate-wash-cement technique reservoir assembly remediation annulus-b pressure...
Proceedings Papers

Paper presented at the SPE Bergen One Day Seminar, April 20, 2016
Paper Number: SPE-180040-MS
... property casing and cementing POOH section 29 operation placement cement and bond evaluation well abandonment North Sea cement plug coiled tubing operator cement formulation Upstream Oil & Gas drill pipe cement plug abandonment cement barrier contamination guideline cement...
Proceedings Papers

Paper presented at the SPE Bergen One Day Seminar, April 20, 2016
Paper Number: SPE-180020-MS
... throughout the industry. With the introduction of the WAB with sealing verification, operators can more easily construct robust and safe wells while at the same time, reducing construction time and cost. casing and cementing mitigation requirement reservoir cement and bond evaluation WAB...
Proceedings Papers

Paper presented at the SPE Bergen One Day Seminar, April 22, 2015
Paper Number: SPE-173864-MS
..., the temperature difference between the casing/seal interface and the seal/rock interface can be significantly reduced. A high-conductivity formation such as halite/rock salt can also reduce thermal gradients in the well materials. production control production monitoring cement and bond evaluation...

Product(s) added to cart

Close Modal