1-2 of 2
Keywords: NPT
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Norway Subsurface Conference, November 2–3, 2020
Paper Number: SPE-200732-MS
... Abstract Non-Productive Time (NPT) is a key measure of cost-effective and successful drilling operations. NPT may be caused by various reasons, such as unpredictable weather or technical issues. Some of those cannot be reduced or controlled (weather), while others can be counteracted by proper...
Proceedings Papers

Paper presented at the SPE Bergen One Day Seminar, April 20, 2016
Paper Number: SPE-180066-MS
... Abstract From a drilling contractor point of view, drilling operation should be always at least on schedule and on budget. However, drilling in challenging environments with different drilling problems (technical and un-technical) causes a lot of non-productive time (NPT), i.e. time where...

Product(s) added to cart

Close Modal