1-20 of 84
Keywords: isolation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–23, 2021
Paper Number: SPE-206052-MS
... that include external casing packers and other solutions such as metallic wellbore isolation solutions. Hydraulically expanded metal packers are a robust and reliable alternative to cement. They are each mounted to a casing joint and can be rotated while running in hole. They have a proven deployment track...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 26–29, 2020
Paper Number: SPE-201376-MS
... reliable than cement bond log evaluation, 4.) stage isolation characteristics can be strongly affected by cluster spacing. reservoir characterization enhanced recovery production control production logging well logging hydraulic fracturing log analysis completion installation and operations...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 2, 2019
Paper Number: SPE-196232-MS
... Abstract Results from a long-term field study to improve zonal isolation show that rotating production casing in unconventional well laterals is possible and that it delivers excellent cement quality. This paper reports the results of the study. To date, 44 production strings have been rotated...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 24–26, 2018
Paper Number: SPE-191561-MS
... Abstract Currently, hydraulic isolation of wells drilled with nonaqueous fluids (NAFs) relies heavily on the elimination of mud from the annuli before the placement of cement. Failure to expel all NAFs will result in residual fluid channels that will compromise well integrity and can even serve...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 24–26, 2018
Paper Number: SPE-191483-MS
... Every cementing operation has a set of specific objectives combining technical consideration (ranging from simple fill-up criteria to sophisticated isolation requirements) with project economics and local regulations. To fulfill its objectives, the cementing design must first consider wellbore...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 9–11, 2017
Paper Number: SPE-187440-MS
... some adopted from deepwater operations, has led to improved zonal isolation and operational efficiencies. The conventional methods used to cure losses during drilling with cement plugs can be inefficient usually requiring multiple attempts with mixed success. A revised method focuses on hydrostatics...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 9–11, 2017
Paper Number: SPE-187216-MS
... communication operation bonding frac and pack isolation completion acoustic impedance big bend mc 698 well logging Big Bend Field Description The Big Bend Field is located in Mississippi Canyon Block 698 in 7,221 feet of water in the Gulf of Mexico. The discovery well, Mississippi Canyon 698...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 9–11, 2017
Paper Number: SPE-187261-MS
... liner from the tip of the toe via an initial circulation operation, then subsequent perforation and packer squeeze operations to remediate any gaps in cement isolation. The paper also shares the details of a recent completion design change implemented on several horizontal wells with slotted liners...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 9–11, 2017
Paper Number: SPE-187080-MS
... production monitoring production logging production control Upstream Oil & Gas communication leakage stage isolation effectiveness isolation effectiveness differential pressure isolation surface area temperature response placement control Reservoir Surveillance classification...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–28, 2016
Paper Number: SPE-181428-MS
... if the design is able to successfully withstand these changes. These models are used to identify the required hydrating and mechanical properties that a cement design should have to maintain zonal isolation during the life of the well, including well plugging and abandonment (P&A). When using a CIS...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–28, 2016
Paper Number: SPE-181441-MS
... on the overall stimulation coverage of each treatment interval evaluated, isolation between stages completed, and trends in production. Several examples of diagnostic data are presented as case histories in addition to the categorized data set. The STACK is one of the four most prolific plays currently being...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–28, 2016
Paper Number: SPE-181619-MS
... of these materials in H 2 S environment. Objective Maintaining the integrity of the cement column throughout the life of the well is crucial in order to achieve full zonal isolation. In many cases, even following cementing best practices is not enough to prevent damage to the cement column. In the past, self...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–28, 2016
Paper Number: SPE-181676-MS
... effectiveness, and ultimately the % incremental estimated ultimate recovery (EUR). fracturing materials proppant re-fracturing isolation lateral hydraulic fracturing Upstream Oil & Gas Completion Installation and Operations communication tracer perforation refrac perforation cluster new...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 28–30, 2015
Paper Number: SPE-174958-MS
... Abstract Openhole gravel pack (OHGP) completions are often selected as the preferred completion technique to provide long life, high capacity, low skin completions. One drawback to OHGPs, however, is the inability to isolate undesirable water or gas within the completion interval whether...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 28–30, 2015
Paper Number: SPE-174982-MS
..., there was no solution to reliably stimulate a large un-cemented or openhole sections. This lead to potential losses of EUR in those wells where for some unplanned event, a section of the wellbore cannot be cemented or isolated with plugs. Recently, a well was drilled and unforeseen issues resulted in 3,300 feet...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 28–30, 2015
Paper Number: SPE-174884-MS
... Abstract Utilization of chemical treatment to isolate or shut off zone is not uncommon in this industry. Cement will normally be chosen as candidate to perform the job as it is more permanent and more economically effective. With recent advanced technologies, cement particles are now designed...

Product(s) added to cart

Close Modal