Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-9 of 9
Keywords: bfpd
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–24, 2008
Paper Number: SPE-116659-MS
... There are currently 62 producing wells in the Orito field, all of the wells are produced using artificial lift. Flowrates range from 4-2200 bfpd and Rod pumps, Gaslift, PCPs and ESPs are used to produce the wells. Additionally, jet pumps are often used to test new wells and gain inflow...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 1–4, 2000
Paper Number: SPE-63042-MS
... of the paper is to discuss which options are available to lift liquids from slim-hole gas wells. spe 63042 efficiency prime mover gas well gas lift bfpd power fluid rotor volumetric efficiency production rate viscosity valve installation jet pump application artificial lift system...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 22–25, 1995
Paper Number: SPE-30495-MS
... proppant flowback fluid barrel flowback time fracturing fluid upstream oil & gas united states government slusher separator morris fracture treatment control proppant flowbackin south texa bfpd flowedback onset Introduction Propped hydraulic fracturing is successfully used in many...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 2–5, 1988
Paper Number: SPE-18236-MS
... bfpd tenneco oil company united states government geologist petroleum engineer modification geology multiphase pump reservoir consideration drawdown valve INTRODUCTION Tenneco Oil Company's Main Pass 297 "A" Platform is located in the Gulf of Mexico approximately 100 miles southeast...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 27–30, 1987
Paper Number: SPE-16882-MS
... united states government manufacturer society geology valve bfpd INTRODUCTION The future of domestic oil production will be closely related to the ability to optimize secondary and tertiary recovery processes. "Reservoir management" is a common term for this process of optimization...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 5–8, 1986
Paper Number: SPE-15427-MS
... to illustrate the reduction in failure frequency which results from proper rod string design, operating practices, and failure analysis. manufacturer sucker rod bfpd beam pumping operating fiberglass sucker rod string void artificial lift system society of petroleum engineers fiberglass rod string...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–29, 1982
Paper Number: SPE-11039-MS
... of 1981. During that time the system has been tested at various production rates up to 155 BFPD and the optimization of components has been carried out. A production version of the system has been operating in Wilmington, California since June of 1982. This installation has demonstrated the versatility...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 23–26, 1979
Paper Number: SPE-8241-MS
... applications. The primarily in high volume lifting applications. The term "high volume" will have different meanings for different areas. If fluid is being lifted from formations at depths of 4500 feet or greater, then 600 to 700 BFPD may be high volume production. Generally speaking, an operator will look...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Fall Meeting of the Society of Petroleum Engineers of AIME, October 6–9, 1974
Paper Number: SPE-5128-MS
...) concept has changed considerably since the concepts were originally formulated. Reservoir Surveillance enhanced recovery increasedrate BFPD carbonate reservoir model grid system production control complex reservoir Judy Creek BHL recovery production monitoring Upstream Oil & Gas...