Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 34
Keywords: barge
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 23–25, 2024
Paper Number: SPE-220764-MS
... for the offshore installation campaign of Project X. More than 20 marine vessels for structure installation campaign which consists of heavy lift main work barge, floatover barge, launch barge, Anchor Handling Tugs Supply vessels (AHTS), transportation barges including its towing tugs, supply vessels, escort tugs...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–28, 2016
Paper Number: SPE-181886-MS
... cleanouts using conventional coiled tubing (CT) and nitrogen had been unsuccessful. The job had to be performed from a work barge in a catenary style, meaning that the injector head, blowout preventers, and power pack were on the platform, but all were operated from a barge. The advanced wireless catenary...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–24, 2008
Paper Number: SPE-114888-MS
... a thorough evaluation process, an innovative pipeline installation approach utilizing a shallow draft work barge was chosen for the project. The project was completed with the successful installation of all four pipelines in December 2007. Despite many challenges, the project progressed smoothly without...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 24–27, 2006
Paper Number: SPE-102261-MS
... platform fabrication Nile Delta knowledge management barge heavy lift derrick barge port Upstream Oil & Gas Suez contractor Mediterranean petroleum engineer Offshore Installation operation Offshore Egypt Gulf sub sea equipment spe 102261 ga field offshore egypt installation...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–29, 2004
Paper Number: SPE-90557-MS
...-packing of a thick, fine-grained interval, and well testing from a DP semi-submersible drilling rig while simultaneously transferring produced hydrocarbons to a transportation barge moored to the rig. The objectives of the pre-completion/DST were to plan and execute the operations safely, validate...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 3, 2001
Paper Number: SPE-71534-MS
... utilizing over 350 well tests under varying operating conditions. A meter was installed on an offshore test barge, so that individual wells could be tested in series with traditional test barge methods. For these trial tests, the total liquid rate ranged from 1300 to 12000 barrels per day, the GOR ranged...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 8–11, 1989
Paper Number: SPE-19529-MS
... drainage in the columns omitting the need for a permanent barge moored on location for waste collection. (2) Upgrade the rigs solids control equipment to reduce dilution volumes. (3) Utilize a dewatering unit to process mud and reuse the water phase in the mud system. (4) Design cuttings...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 8–11, 1989
Paper Number: SPE-19709-MS
... Fisheries Service under the Endangered Species Act. Removal operations began at the "A" platform on October 28, 1988 and at the "B" platform on November 24, 1988. The derrick barge phase was completed in 39 days (including 13 weather and mechanical downtime days) without an OSHA recordable accident...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 8–11, 1989
Paper Number: SPE-19705-MS
...:50 scale model test for the purpose of verifying and calibrating the mathematical study. The Two-body, coupled motion analysis by Oscar used a three dimensional diffraction analysis of the tanker barge and a Morison element model of the semi combined with the stiffness properties of the mooring...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 2–5, 1988
Paper Number: SPE-18052-MS
... Elimination System permit program. The cuttings were from unconsolidated sandstone and shale formations. Disposal of muds and cuttings was via a specially designed barge that can hold up to 6000 barrels of waste material. The muds and cuttings were blended together when loaded onto the barge and the, slurry...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 27–30, 1987
Paper Number: SPE-16673-MS
... is possible adjacent to a burning blowout. This project proved concepts in underwater work, firefighting, and snubbing. A unique general-contractor approach enhanced communication and efficiency. bop stack riser assembly barge lake maracaibo completion installation and operations guide post work...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 5–8, 1986
Paper Number: SPE-15497-MS
... February 1983 Project Inception April 1983 Criteria Determined for South Louisiana July 1983 Candidate Reservoir Chosen July 1983 Bid CO 2 Supply and Barge August 1983 Unitization Process Begun September 1983 Bid Pumping Services October 19 83 Award Both Bids October 1983...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 22–26, 1985
Paper Number: SPE-14354-MS
... hondo platform upstream oil & gas transfer function heritage platform barge heritage site platform tow criteria spe 14354 spectrum geologist north america government structural geology plate tectonics thickness transpacific tow company united states government earthquake exxon...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 16–19, 1984
Paper Number: SPE-13154-MS
... with reference points when evaluating new field development schemes. Semi-submersible Converted Tanker New Built Tanker Tandem Barge COMPARATIVE STUDY Basic Design Criteria for Representative Field Operating Costs Fixed Platform FIELD APPLICATIONS Initial Screening of Alternatives...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 26–29, 1982
Paper Number: SPE-11173-MS
... REQUIREMENTS AND SEA CONDITIONS FOR CRITICAL PHASES OF LOAD-OUT AND INSTALLATION TIME REQUIRED SEA CONDITIONS (H ) ACTIVITY PLANNED ACTUAL LIMITING ACTUAL 1, Buoy Loaded Onto Cargo Barge 1 Day 1 Day - Protected Waters 2. Base Mated to Buoy 1 Day 1 Day - Protected Waters 3. Tow...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 4–7, 1981
Paper Number: SPE-10211-MS
... the J-tube, was attached to the pulling head. The cable then extended from the pulling head through the J-tube to the pull barge, anchored about 1000 feet shoreward of the SALM base. This placed the barge about 9000 feet from the Hondo platform. The pulling unit was a Lucker continuous pull machine...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, October 4–7, 1981
Paper Number: SPE-10212-MS
... TABLE 1 DATE OF EVENTS FOR SALM BASE INSTALLATION PRELOADOUT AND LOADOUT ACTIVITIES ---APRIL 23 BASE TRANSPORT BARGE TOW TO PORT HUENEME APRIL 23 – APRIL 25 MOBILIZATION OF DRILLSHIP APRIL 23 – MAY 1 SETDOWN OF BASE AT TRANSFER SITE BY DERRICK BARGE APRIL 30 – MAY 2 BOTTOM...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 23–26, 1979
Paper Number: SPE-8296-MS
... in use elsewhere. Upstream Oil & Gas liquified natural gas gas monetization LNG Prudhoe Bay alyeska oil pipeline crude oil Methanol barge proposal MeOH asilomar government Efficiency alcohol fuel technology Anon dispersion gasoline transportation pipeline grade meoh...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Technical Conference and Exhibition, September 23–26, 1979
Paper Number: SPE-8468-MS
... the selection of the crane barge for emplacement. Further, this knowledge indicates the ability of the Platform to carry additional plant during production, for full exploitation of a field. Experience has shown that Platform weights always increase, so, if weight and balance knowledge is neglected the result...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Annual Fall Technical Conference and Exhibition, October 9–12, 1977
Paper Number: SPE-6809-MS
... Abstract Offshore pipelines may be installed by several methods including lay barge, reel barge, bottom tow/pull and combinations of these. Technical advantages and limitations of each method are presented as well as their impact on the cost presented as well as their impact on the cost...
1