1-20 of 312
Keywords: assembly
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 3–5, 2022
Paper Number: SPE-210328-MS
... Figure 1 shows the drawings of conventional ESP systemand Rigless CDESP System with conventional ESP assembly. Besides that, it is simpler and more efficient during installation compared with wireline retrievable ESP and most coil-tubing deployed ESP system, no additional wireline...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–23, 2021
Paper Number: SPE-205868-MS
... directional drilling upstream oil & gas undesired fluid dar system production control conformance improvement drilling operation final flow performance test efficiency performance curve fluid control module flow rate assembly inflow pressure drop viscosity contrast negative consequence...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–23, 2021
Paper Number: SPE-206309-MS
... already optimized for rig time gain; this is a long-time industry effort with several techniques well consolidated. The key objective here was to implement a next step in opmization using the auxiliary deck to assemble and service long piece of equipment minimizing rig time. Abstract This paper...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 21–23, 2021
Paper Number: SPE-206374-MS
... and cementing securing zonal isolation reservoir surveillance proppant well integrity zonal isolation drilling fluids and materials annular pressure drilling liner diameter valve system expansion sleeve mep procedure assembly differential pressure poor cement isolation deployment petroleum...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 26–29, 2020
Paper Number: SPE-201435-MS
... from its last zone. A 2-7/8-inch bottom hole assembly of JP was run at 9,348 ft depth during the well completion. Jet pump was freely dropped in the well to offload the kill fluid and revive the production. Rig pump was used to inject power fluid at high pressure in the tubing and returned fluids were...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 26–29, 2020
Paper Number: SPE-201616-MS
... wolfcamp bit selection upstream oil & gas variation rop rotation presentation bit rpm assembly torque configuration directional drilling systems and equipment lateral real-time measurement bha mse adj rpm society of petroleum engineers Introduction A series of DBR bit dulls...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 26–29, 2020
Paper Number: SPE-201681-MS
...-productive time (NPT) event. Being a mature field of known drilling performance and no significant structural or lithological variations, the interval was planned for one run with a Rotary-Steerable-System (RSS) bottom hole assembly (BHA). During the horizontal drilling of a particular well, the BHA began...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 26–29, 2020
Paper Number: SPE-201276-MS
... actuator fail-safe production tree assembly equinor wellhead annulus valve valve electric actuator offshore technology conference hydraulic system Introduction There are a number of valves on production wells that require fail-safe reliability: The Production Wing Valve (PWV), Kill Wing...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, October 26–29, 2020
Paper Number: SPE-201349-MS
... completion connector engineering completion installation and operations upstream oil & gas communication lower completion assembly fiber optic connector deployment successful installation engineering team fiber upper completion procedure packer service company expansion joint...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 2, 2019
Paper Number: SPE-196151-MS
... and fully transparent so we could understand the different toolstring’s behaviorsbehaviours depending on the Bottom Hole Assembly (BHA) set up and shape of the deformation. The deformation testing system has been created as a light weight interchangeable tubular system designed to interlock quickly...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 2, 2019
Paper Number: SPE-196070-MS
... bearing intake open area packer application ESP system society of petroleum engineers Upstream Oil & Gas particle assembly integrity slot size Introduction For many years different companies have developed different methods, technologies and procedures to control the sand inflow...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 2, 2019
Paper Number: SPE-196227-MS
... of Colombia. Effective isolation proved to be historically difficult to achieve. The operator was approached with a solid metal expandable sealing system with rotation capabilities as an annular barrier for a preferred cementless completion. The sealing system needed to be assembled on a full-bore liner able...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 2, 2019
Paper Number: SPE-196187-MS
... in identifying areas of opportunity to meaningfully increase reserves and production in heavy oil reservoirs in Alberta as well as around the world. Upstream Oil & Gas heat-injection rate Oil Viscosity Directional Drilling downhole electric heating assembly enhanced recovery viscosity...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 2, 2019
Paper Number: SPE-195848-MS
... environment. In addition, for assurance of motor reliability, rigorous and methodical design validation and qualification testing of basic materials, components, sub-assemblies were undertaken. enhanced recovery Conductor internal temperature module thermal method steam-assisted gravity drainage...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 30–October 2, 2019
Paper Number: SPE-195992-MS
... became obscured and downhole dysfunction detection required physical sensors located in the drilling assembly. The early downhole shock counters, however, only recorded data in memory for post-drilling analyses and for enforcing warranty claims. Finite Element Analysis (FEA) has been used effectively...
Proceedings Papers

Paper presented at the SPE Annual Technical Conference and Exhibition, September 24–26, 2018
Paper Number: SPE-191430-MS
... in the planning process of this completion. The ESP Service Partner performed a System Integration Test (SIT) in a test well to verify equipment functionality and optimize the assembly procedure. Following the successful (SIT), the first installation was completed in early 2017. The systems installed to date...

Product(s) added to cart

Close Modal