Abstract
A kick simulator was used to plan for well control situations on a deep high pressure well. Results from the simulations were used to identify requirements and modify rigsite well control procedures. The result of the work is safer rig-site operations at little extra cost. Extension of this work to well design in general suggests the potential for safer well operations and simultaneous cost savings.
Copyright 1992, Society of Petroleum Engineers
You can access this article if you purchase or spend a download.