Abstract
Offshore reservoirs requiring sand control pose a major completion challenge because of extremely high cost and risk involved in remedial treatments, particularly in sub-sea completion and/or deep-water environments. It is therefore of utmost importance to ensure sand control without sacrificing flow conformance, recoverable reserves and well deliverability throughout the expected life of the completion. A major trend in these environments is towards open-hole, horizontal, gravel-packed completions. Although gravel packing stabilizes the wellbore, it can also entrap the filter-cake formed by the reservoir drilling fluid, potentially resulting in high drawdown requirements (flow initiation pressures) and/or low production rates (retained permeabilities). The cleanup procedures in the industry have varied significantly from no cleanup at all to complicated two-stage breaker treatments involving post-completion coiled tubing intervention, with no guidelines existing in the literature.
In this paper, we present experimental results and field cases involving filter-cake flow-back through gravel packs with and without cleanup. Effects of various parameters, including gravel size (40/60, 20/40, and 12/20), formation permeability, drill-solids type (clays, quartz) and concentration, and the type of cleanup fluid have been investigated. Flow initiation pressure and retained permeabilities during flow back are reported as a function of these parameters. The experimental results show that the flow initiation pressure is a strong function of gravel size and the type of drill solids. It is concluded that, in clean (low-to-no clay content) formations of large grains and high permeabilities (~ several darcies) requiring large gravel sizes (e.g., 12/20), an enzyme or an oxidizer treatment is sufficient based on laboratory results and productivity predictions. This conclusion is also supported by several field applications as shown. In lower permeability (~ 100–250 md) formations of small sand sizes requiring smaller gravel (e.g., 40/60) elimination of both the fluid loss control agent (starch) and bridging agent (CaCO3) is necessary based on high flow initiation pressures and low retained permeabilities. In intermediate permeability (~ 500–800 md) formations of medium size sand-grains typically requiring 20/40 gravel, the results depend strongly on the type of drill solids: in clean formations (no clays in drilling fluid), an enzyme or an oxidizer treatment is sufficient, while in dirty formations removal of both CaCO3 and starch is necessary. These results are also supported by field case histories presented in the paper.