Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 25
Keywords: wellhead
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215488-MS
... Abstract Well integrity management for High Temperature (HT) wells can be challenging due to stresses and cyclic behaviour during thermal expansion or corrosive stress cracking that may impact the fatigue life of wellhead, tubing and casing. The impact can be catastrophic and detrimental...
Proceedings Papers
Qinghai Yang, Chenglong Liao, Zhongxian Hao, Qiaochu Shen, Jilei Xu, Hongyu Zhao, Yuan Li, Shuming Du
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215373-MS
... and identifiable lifting load pulses at the wellhead. Moreover, with the increasing opening of the adjusting valve, the lifting load increases significantly. The average load when the adjusting valve is fully opened is 33.65kN, an increase of 64.7% compared with the normal lifting load. When the adjusting valve...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202315-MS
... Abstract An increasingly common problem faced by subsea well operators is plugging and abandonment (P&A) of wells using modern drilling vessels. This challenge is due to older wellhead and conductor designs which are not fatigue resistant and which have less bending load capacity. Combined...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202293-MS
.... The screening criteria consist of cement quality and quantity, casing metallurgy and wellhead grade. The screening results will be categorized under three different risks; low, high and unknown-risk. Each of the categories and the evaluation methods will be discussed in-depth in this paper. The assessment...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186321-MS
... are crucial targets for gas well snubbing. To achieve this target, we developed a set of snubbing wellhead for low pressure gas well which operation pressure is less than 14MPa. Some key technologies are formed, such as airtight makeup and breakout device, gas sealing system, rotating slips etc. The unit can...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 25–27, 2016
Paper Number: SPE-182427-MS
... Deepwater Well Well Design Wellhead weldon connector conservative design approach exploration well envelope conductor connector mudline integral connector slim well design rig structural conductor fatigue performance conductor system Introduction PETRONAS Carigali Brunei Ltd. (PCBL...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176416-MS
... lift equipment: gas-lift and BC. The objective is to maximize field oil/condensate production under other field operating constraints. The controllable parameters are: amount of gas to be injected into each oil well, well to be routed to BC, and wellhead flowing pressure from each well. The result...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 22–24, 2012
Paper Number: SPE-157977-MS
...TOC effect on the wellhead movement and thermal force behavior Looking at Equations 1 , 5 , and 6 , one can see that the length of uncemented tubular in a well will affect the thermal force and wellhead movement. Fig. 2 , 3 show the thermal force and wellhead growth in relation...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2010
Paper Number: SPE-131395-MS
... of appraisal / exploration wells in the East Timor Sea for a Joint Venture Group. The paper will review operations using three different rigs; one semi-submersible and two jack ups, each deploying a different wellhead configuration / method to drill exploration / appraisal wells in the same field. A review...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Asia Pacific Oil and Gas Conference & Exhibition, August 4–6, 2009
Paper Number: SPE-123472-MS
... Abstract This paper describes the development of a deepwater casing shoe which ensures subsea casing strings designed to land in a wellhead can be run to full wellbore depth with no rat hole. The problem with excess rat hole occurs when drilling and hole-cleaning operations enlarge a normally...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 20–22, 2008
Paper Number: SPE-114804-MS
... learned were outlined and modifications were made to the blast joint and wellhead. Subsequent treatments were performed without mechanical failures with 350k and 282k lbs of proppant pumped at 30 to 35 bpm injection rates. The completion cycle time was reduced about 20% with substantial savings of up...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Asia Pacific Oil and Gas Conference and Exhibition, October 30–November 1, 2007
Paper Number: SPE-106910-MS
... Abstract Manual wellhead data collection is manpower intensive and requires significant time to collect and distribute in addition to the associated problems such as incomplete and missing data. Remote realtime well surveillance eliminated these problems by providing the data real-time...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, September 11–13, 2006
Paper Number: SPE-101065-MS
... reservoir, with a static pressure of approximately 6,300psi, giving rise to a maximum wellhead pressure of about 4,500psi. There was a possibility of trace H 2 S in the reservoirs, but this trace was not seen during the perforating operations. Technical Challenges Remote Location The oil patch...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, September 11–13, 2006
Paper Number: SPE-101868-MS
... lower zone communication operation personnel completion installation and operations Subsea Operation pipeline rig drilling rig Wellhead subsea intervention TRT well intervention valve production enhancement intervention riser Positioning System guideline petroleum engineer spe 101868...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2004
Paper Number: SPE-88492-MS
... rate production rate production control correlation geometry gas velocity upstream oil & gas reservoir surveillance design 1 sand free production wellhead erosion production logging offtake rate shear stress calculation design 2 application choke ter university whfp erosion...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, April 17–19, 2001
Paper Number: SPE-68699-MS
...Phase 2: Extending the concept The key enabler for further improvements was the close cooperation between the operator and wellhead supplier. Both parties agreed on the requirement to further improve the design and installation times of the CSW™ and established the exact requirements...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, April 17–19, 2001
Paper Number: SPE-68700-MS
... production monitoring flow rate information neural network wellhead operation upstream oil & gas inflow performance thrasher machine learning oil well lift system optimization petroleum engineer reservoir-artificial spe 68700 vector reservoir surveillance artificial lift system...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 16–18, 2000
Paper Number: SPE-64507-MS
... and controlling return circuit, the hydraulic cylinder is set in the working barrel under the wellhead. In order to collect the signal of the piston arriving the top and bottom dead center, the both stroke holes are set in the inner tube of the hydraulic cylinder. The wellhead's installation area and height...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 16–18, 2000
Paper Number: SPE-64489-MS
... enhanced recovery remediation of hydrates wellhead phase 1 liquid holdup INTRODUCTION Esso Australia Pty Ltd (Esso) manages 17 production platforms of various sizes and five subsea wells on behalf of the Joint Venturers, Esso Australia Resources Pty Ltd and BHP Petroleum (Bass Strait) Pty Ltd...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, April 20–22, 1999
Paper Number: SPE-54316-MS
... In stages 1 and 2, the lower lubricator assembly, consisting of the wellhead connector, wire-cutting gate valve, triple-ram BOP, hydraulic latch, and guide frame, is deployed and attached to the subsea tree. An operator-supplied tree running tool is used to connect the lower lubricator assembly...
1