1-5 of 5
Keywords: well cleanup
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-192119-MS
... LNG facility. The operational guidelines required each development well to commence with a single well cleanup flow to the Wheatstone platform. The initial single well cleanup flows of the Wheatstone field allowed scope for the selection of a well flow sequence with observation at non-producing wells...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 22–24, 2012
Paper Number: SPE-158026-MS
... size cleanup well cleanup cleanup operation dynamic simulation completion fluid upstream oil & gas temporal variation completion beanup procedure well fn-a2 Introduction A newly drilled and completed well contains a combination of drilling mud, packer fluid, completion fluid...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 22–24, 2012
Paper Number: SPE-158463-MS
... installation and operations spe 158463 dhg upper fcv packer production zone valve well cleanup australia lower zone intelligent completion fcv kitan oil field Introduction The Kitan oil field is located in JPDA 06-105, about 200 km south of the East Timor coast and 500 km offshore...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2010
Paper Number: SPE-133838-MS
.... Conclusions from this work were crucial to contingency planning and proved to be invaluable in successfully executing and optimising well clean-up operations, the field start-up planning and the production ramp-up. hydrocarbon reservoir simulation case 2 well cleanup artificial intelligence kickoff...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2004
Paper Number: SPE-88524-MS
... drilling operation upstream oil & gas cleanup drawdown completion spe 88524 key enabler well cleanup liner downhole sensor smart completion development plan reservoir characterization snake well design selective zone cleanup stinger completion monitoring systems/intelligent wells zone...

Product(s) added to cart

Close Modal