1-5 of 5
Keywords: well candidate
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221155-MS
... that new technology implementation gave a good signal of an effort that could help to maintaining high existing National oil production and hopefully also contribute to achieve Indonesia's main goal oil production one million barrels oil per day in 2030. Screening wells candidate is the next crucial...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186936-MS
... reservoir sla well envelope tunu shallow development Drilling society of petroleum engineers completion well candidate light architecture marginal reserve Introduction Switching to Shallow and Unconsolidated Reservoirs Tunu is a gas condensate field situated in the swamp environment...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176191-MS
... implementing lessons learned which significantly increased its success ratio and oil gain. downhole intervention Upstream Oil & Gas perforation interval oil gain water shut-off co rst log COWC water production production enhancement structure location well candidate Well Intervention new...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2010
Paper Number: SPE-132855-MS
... Nodal Analysis 2 , 3 was used to estimate the gas flow rate for any flowing tubing head pressure. Several well candidates were assessed to determine optimum compressor capacity. The result of the analysis, confirmed by well test data, was used to define the separator capacity for the liquid...
Proceedings Papers

Paper presented at the Asia Pacific Oil and Gas Conference & Exhibition, August 4–6, 2009
Paper Number: SPE-124276-MS
..., using the common well testing equipment package. It is relatively easy to assemble and is not a permanent structure and can be mobilised from one platform to another. The sizing of the equipment can be customised based on the deck space availability as well as the reservoir potential. Well candidates...

Product(s) added to cart

Close Modal