1-13 of 13
Keywords: shutdown
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221149-MS
...Problem Framing There are two main problems that we have with the RC package in our operation. These are 1. The equipment is not fully utilized to its optimized capacity., and 2. There is a high number of downtimes from unplanned shutdown cases causing loss of production opportunities...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205751-MS
... meeting its production commitments. service provider requirement petroleum engineer hot check shutdown availability better life cycle artificial lift system esp trip surface equipment long-term reliability upstream oil & gas checklist service company pmp comprehensive esp...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202249-MS
... case studies that integrate field experience into design to optimize design scenarios for hydrate prevention during gas-condensate well start-up. The first case study shows how the shutdown and start-up scenarios typically considered for design are benchmarked with historical data to avoid unrealistic...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196478-MS
... recovery: A system that assist operation to achieve normal production conditions from shutdown state in a stable and quick manner. The use of such an ITMA system in designing and proactively evaluating start up procedures can help reduce the unstable production period and minimize risk of flow...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191957-MS
... of water injection post WIF shutdown. This is despite the duration of shutdown being shorter than the frequency of required sampling, which led to prolonged injection downtime. The requirement for water sampling for satellite platforms were modified to be less stringent while still maintaining good water...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186890-MS
.... – Construction challenge and requirement for shutdown. – Contractual strategy, principle of construction sequence, and SIMOPS requirement. – Optimization of tie-ins point number. Statement of Requirement (SOR) At the end of pre-project study, all technical requirements for the Project were...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2010
Paper Number: SPE-133948-MS
... if the platform was to shutdown. An understanding of the wax characteristics specific to the Snapper & Moonfish crude was obtained by leveraging expertise from ExxonMobil's global organization including ExxonMobil Upstream Research Company, local technical experts, external consultants and research groups...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, September 11–13, 2006
Paper Number: SPE-100796-MS
... topsides investment, the new AA LDHI will no longer be applicable once the WC increases above 80%. Anticipating the short life of the well, it was decided to challenge the current hydrate management strategy rather than putting new investments. First, the overall shutdown and cold restart procedures...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2004
Paper Number: SPE-88594-MS
... to be an extremely challenging year with plenty of unplan downtime due to something that was never anticipated. reliability engineer shutdown gas turbine compressors engines and turbines spe 88594 maintenance discharge pressure compressor train turbomachinery availability upgrade availability design...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, September 9–11, 2003
Paper Number: SPE-80500-MS
... are the same. The reason is that there is very little incremental cost to implement full remote operation capabilities on green-field projects, whilst the same cannot be said for the existing brown-field projects for it has to take into account of the offshore implementation costs and facilities shutdown...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 16–18, 2000
Paper Number: SPE-64489-MS
... innovation spe 64489 subsea system pipeline upstream oil & gas flow assurance operation tarwhine jumper subsea development communication hydrate formation flowbase shutdown subsea well injection connector control system cable scale inhibition completion installation and operations...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference, October 28–31, 1996
Paper Number: SPE-36999-MS
... experienced in all four Bardegg installations and the next step was to analyse data and formulate theories to identity the root causes. Information on compressor shutdowns were made available from the monthly "Summary of Compressor Shutdown Status" reports and an analysis of the data was carried out...

Product(s) added to cart

Close Modal