1-20 of 67
Keywords: personnel
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215391-MS
... Abstract In a standard conventional oil & gas service, each specialized downhole drilling tool service requires dedicated personnel to execute the field operation. This includes but is not limited to measurement while drilling (MWD), logging while drilling (LWD), directional drilling (DD...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215229-MS
... onsite personnel are needed while the area is continuously monitored 24/7 from anywhere in the world. Key advantages of remote gas monitoring include: Remote gas monitoring Abstract Top 8 digital safety trends in Oil and Gas in 2023 Oil and Gas is one of the most hazardous industries...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205630-MS
... analysis result human factors hsse reporting incident operation incident system petroleum engineer consequence personnel incident investigation mahakam injury procedure management system similar incident Introduction Incidents may cause losses to organization. Losses can affect human...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205610-MS
.... This paper focuses on two case studies- one from upstream and one from downstream using RTLS (Real Time Location Services). Two types of challenges were present: the first one being the identification of the location of all personnel on site in case of emergency and ensuring that all have mustered...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205705-MS
... challenges as multiple activities are carried out by numerous personnel and contractors, in a short duration of time. This risk is further amplified with the additional restrictions, challenges and complications posed by COVID-19. The key challenge for turnaround managers in current times is to ensure...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205800-MS
... & gas indonesia artificial intelligence well intervention efficiency downhole intervention production enhancement micro ct unit new well intervention pt pertamina hulu mahakam offshore minimalist platform concept coilhose personnel mahakam intervención de pozos petroleros coiled tubing...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205535-MS
... relatively faster by 1-2 hours than normal conventional CT. Smaller footprint allows safe distance between equipment spread and safer walkway access for personnel during operation or emergency. Smaller injector head/gooseneck/jacking frame, poses less height exposure risk to personnel during rig up and rig...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205729-MS
... of well planning database, resulting in data disagreement and lack of data integrity. Thousands of emails are being send and meetings are being organized to guarantee that operations runs well. Due to lack of trustworthy data, personnel movement or team reorganization, it has become serious issues...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196297-MS
.... The downside is the limited capability to identify operational anomalies. The latest popular strategy to mitigate this downside is using a Decision Support Center to obtain the most benefit from this data. Decision Support Center should be available for 24-hour operations and consists of multiple personnel...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196369-MS
... with the potential cost incurred by considering the possibility of success and potential changes on other aspect of the well construction that need to be adjusted to accommodate the application and mitigate its potential risk. Then a drill-well-on-paper session held with all personnel that would involve...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196340-MS
... requirement Implementation manual transmission perforation charge recommendation personnel well site operation operation division society of petroleum engineers complex reservoir NPT six sigma Introduction Saudi Aramco is in the development mode of its own unconventional resources program...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196457-MS
... the act/ situation with respective personnel in order to capture the positive point as well as point of improvement from the act/ situation being captured. Key points of this initiative are no blame culture; open mind and sharing knowledge are the utmost spirit when delivering this program. Therefore...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191866-18APOG-MS
... well control annular pressure drilling Artificial Intelligence separator mitigation drilling fluids and materials surat csg well aerated mud hole section personnel drilling system coal seam aquifer drilling fluid management & disposal Upstream Oil & Gas Coal Measure walloon coal...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191892-MS
... requirement slurry kulakofsky personnel Ravi variable choke manifold operation reduction cement design Australia batch mixer mechanical property lbm gal potential risk society of petroleum engineers Physical Properties/Benefits of Foamed Cement Introduction Foamed cement benefits have...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186257-MS
... and performance. Total E&P Indonesie TIMS is applicable to all operational activities and assets under TEPI custodianship, from early conceptual studies, engineering, construction, and operations up to sites restitution. Adherence to this Integrity Management System is applicable for all TEPI personnel...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186984-MS
... are the high proportion of direct involvement of human resources with equipment and materials, turnover of personnel and various educational background levels of the workers. In 2014, there were 11 recordable injuries where 4 of them are Lost Time Injuries (LTI). Based on the incident analysis, the root causes...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186988-MS
... Abstract There are several parties involved in the implementation of manpower contract management in Total E&P Indonesie (TEPI); the manpower contract personnel, the contractor, Manpower Contract Department (specific department in TEPI who in charge for managing labor supply), and User...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186290-MS
... Abstract During transfer process in manpower contract management, communication issues may appear and affect the involving parties. It is not merely happened within internal company, but also with the contractors who shall provide the services and the manpower contract personnel as subject...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186175-MS
... Upstream Oil & Gas platform production monitoring scrubber oil production Reservoir Surveillance system application rr field gas problem abandonment pressure gas rate 2 personnel thermal radiation reservoir pressure reactivation gas scrubber project production control radiation...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186281-MS
... well envelope personnel valve criteria logic TEPI mahakam block envelope software integrity status INTRODUCTION Mahakam oil and gas block of Total E&P Indonesie (TEPI) are located in the East Kalimantan Province, Indonesia. This block consists of three fields in swamp environment...

Product(s) added to cart

Close Modal