1-20 of 59
Keywords: liner
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202316-MS
... production control fluid modeling completion monitoring systems/intelligent wells pressure transient analysis production monitoring hydraulic fracturing completion installation and operations drilling operation fracture aperture liner coefficient fracture reservoir surveillance...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196296-MS
... is the first application in Algeria and probably worldwide production monitoring Reservoir Surveillance hydraulic jet pump liner production control multiphase pump lean gas well operation Upstream Oil & Gas manifold fraction pump system artificial lift system Artificial Intelligence...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196550-MS
... the reservoir section and completed by running a perforated liner. In the 3 rd and final sidetrack, the drill pipe completion idea was successfully executed resulting in a well that is producing ∼40 MMSCFD. The idea was selected after technically evaluating other viable options such as liner drilling using 5...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-192104-MS
..., the liner hanger was identified as the most critically loaded component in a rotary liner drilling application. The key technical considerations desired for a rotary liner hanger system for this specific application included the following: Torque and drag evaluation [ 2 ] ECD management...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186320-MS
... could be controlled with the customized system, the casing normally set to shut off the troublesome zone could be extended to target entry. The trial test of this concept was successful. Resulted savings include eliminating the liner installed in the standard well design, saving rig days...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186918-MS
... for future optimization in these types of wells. annular pressure drilling drilling operation drill pipe mud weight Upstream Oil & Gas cement pipe mechanical back ppg well control POOH liner coil slurry torque Circulate reservoir cement squeeze job hole size assembly jurassic...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186981-MS
... dimensions, Liner hanger assembly outer / inner diameters and lengths Calipered open hole size Directional surveys (even for "vertical" wells), Calculated standoff & eccentricity modeled using actual centralizer type and positioning. Representative rheological modelling - The selection...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 25–27, 2016
Paper Number: SPE-182208-MS
... by Expected Value Decision Analysis. The expected value of each option included CAPEX, OPEX, NPV, and all quantified aspects and risk. The thermoplastic plastic pipe assessed is a flexible pipe for shallow water consisting of polyethylene (PE) internal liner, annular ring steel strip armor, and PE outer...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176268-MS
... Abstract The capability to reliably deploy large-bore hangers in offshore applications is critical to project success ( McCormick et al. 2013 ). This case study discusses the the deployment of a large-bore expandable liner hanger (ELH) for the first time in a West African country and how...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176116-MS
... pressure high temperature zonal isolation compressive strength expansion advanced isolation material cement chemistry self-healing cement critical high-temperature high-pressure well software Upstream Oil & Gas cement sheath liner isolation integrity casing and cementing cement slurry...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176069-MS
... that the cementing bonding in the dual casing section was commonly unsatisfactory in the production liner cementing. Factors that affect cementing quality, including fluid density/rheology hierarchy, pumped fluid volume, and pumping rate, were verified and excluded from consideration as possible causes for the bad...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 14–16, 2014
Paper Number: SPE-171487-MS
... in the horizontal annular, with the results showing in Figure 4 -a and 4 -b. The models are made of transparent synthetic glass, and the both of the wells are completed with 5.5in sand screen liner in 8.5in open hole. It is shown that, the RE-ACP slug is evenly pushed into the horizontal annular and fills...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 14–16, 2014
Paper Number: SPE-171490-MS
... To mitigate any losses during the cement job and ensure a high quality cement job, the innovative sealing spacer was recommended and it was pumped for the first time. The 7 in. liner was cemented by pumping 60 bbl sealing spacer (weighted to 10.5 ppg) ahead of 14.0 ppg cement slurry consisted...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 22–24, 2013
Paper Number: SPE-165795-MS
.... The top of the structure has a large gas cap zone and at the bottom, an aquifer is noticed. The D level (producer zone) has the gross thickness of 20 meters, with static pressue around 20 bars. The probable bad cementation on the 7’’liner covering B, C levels, carry the unwanted water to flood D; as B...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 22–24, 2012
Paper Number: SPE-160496-MS
... system reservoir surveillance drilling operation tractor production logging spe 160496 upstream oil & gas liner production control artificial intelligence injector ct head saudi arabia acid stim 6 1 8 assessment real time production society of petroleum engineers stimulation...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, September 20–22, 2011
Paper Number: SPE-145931-MS
... barrier provides long term robust and reliable zonal isolation in cemented or un-cemented completions and may also be used in conjunction with liners or long-string casing. Additionally it provides higher differential pressure capacity and higher expansion coefficients without compromising the inner...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2010
Paper Number: SPE-133321-MS
... of the well. A perforated or slotted liner is being seen as a cost effective and suitable completion system for such a field. However, flow convergence pressure loss is a major concern in the application of perforated/slotted liners in an oil reservoir. An efficient completion design must take...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2010
Paper Number: SPE-134031-MS
... proppant jobs, coal fines can be an issue in these wells. The specialized process of cavitation requires high permeability for effective sloughing of coal into the open hole of these wells. A liner is placed in the open hole and tied back into the cemented pipe above to maintain hole stability after...
Proceedings Papers

Paper presented at the Asia Pacific Oil and Gas Conference & Exhibition, August 4–6, 2009
Paper Number: SPE-122804-MS
..., saturation logging, perforation and stimulation. CT units utilization played the main role in this program. Large number of these wells were completed with 2 7/8" cemented horizontal liner and 4 ½" tubing equipped with gas lift system. These wells were sidetracked using CT drilling. The length...
Proceedings Papers

Paper presented at the Asia Pacific Oil and Gas Conference & Exhibition, August 4–6, 2009
Paper Number: SPE-123953-MS
... be noted that a gigantic vessel with an expensive mooring or dynamically positioning system is required to handle this huge and heavy riser accurately and keep the rig in an operational range. drilling operation drill pipe drilling method Drilling Equipment circulation liner pressure window...

Product(s) added to cart

Close Modal