Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-11 of 11
Keywords: drilling rig
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215416-MS
... system anomalies, e.g., thinning, or historical leak. Permanently replacing the defective pressure system is the ideal solution. However, this solution is not the practicable one by considering limited time constraints prior to drilling rig or liftboat approach NUI. Repair by using composite wrapping...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215431-MS
... that was drilled and tested in 2019 with a 2,000HP land drilling rig. The well had two zones of open perforation and it was then suspended with a combination of inflatable cement retainer, cement and sand plugs, and another V0 hydraulic plug above it. The first operational scope was to prepare the wellbore...
Proceedings Papers
Masoud Nasiri Zahed, Alastair Punler, Clare Purkis, Aaron Boase, Steven Smillie, Mark Duff, Fraser Park, James Cobb
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210680-MS
... to the drilling fluids design and reviews the performance of the WBM on these wells, focusing on its salinity and recyclability. As part of the change from SBM to WBM, a fundamental re-design of the Solids Control Equipment on board the drilling rig was also carried out. The SBM cuttings treatment system...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210722-MS
... tension completion installation and operations assessment effect upstream oil & gas riser drilling riser shallow water wellhead fatigue petroleum engineer hydrodynamic diameter hydrodynamic loading loading drilling rig weight Introduction A drilling riser connected to a shallow...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176047-MS
... production capacity from current 3.0 Million BPD to 4.0 Million BPD, the company deployed many on-shore drilling rigs on a fast track basis during past two years. Present Rig Fleet includes 25 deep drilling rigs and 60 development drilling & work over Rigs. The Company has established the HSE Management...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176228-MS
... invaluable experience for the development of tight-gas sands and shales in China. complex reservoir trajectory drilling rig China case study Artificial Intelligence Directional Drilling block su53 application horizontal well factory tight gas Upstream Oil & Gas Sulige gas field batch...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 22–24, 2012
Paper Number: SPE-156235-MS
... operations from the drilling rig critical path. We will document recent projects in Australia, Asia and the Gulf of Mexico in which the tubular running service company improved efficiency by managing logistics, preparation and preassembly of tubular stands, safe installation and shipment to the operational...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, September 20–22, 2011
Paper Number: SPE-147940-MS
... injector wellhead platform upstream oil & gas platform fpso new technology installation enhanced recovery waterflooding reservoir characterization maari field drilling rig heating system directional drilling spe 147940 drillstem/well testing new zealand application production well...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2010
Paper Number: SPE-132931-MS
... authority. Worked with the regulatory agencies to allow for real-time movement of vibroseis lines and seismic shot points to avoid unique flora and fauna habitats identified during the course of the Survey to achieve best environmental outcome. Reservoir Characterization drilling rig disturbance...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, September 11–13, 2006
Paper Number: SPE-101868-MS
... Abstract ExxonMobil 1 subsidiary Esso Australia Pty Ltd recently completed the first subsea intervention using a jack-up drill rig in Bass Strait, Australia. This case study provides an overview of the intervention and how the key challenges were overcome. Prior to the intervention...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2004
Paper Number: SPE-88531-MS
... productive layers. This paper describes a successful Geosteering application using the latest technologies to transfer, edit and analyze information in real time. Real-time LWD data were transmitted via the INSAT 3B satellite from the offshore drilling rig to the Virtual Reality Centre in Mumbai City, India...