1-20 of 40
Keywords: construction
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210748-MS
... in road and construction applications ( Page et al., 2003 , Abbe et al., 2009 , Mostavi et al., 2015 , Ayati et al.,2018 ). Statement of this work The purpose of this work is to evaluate possibility in recycling drill cuttings waste, treating drill cuttings as resource instead of waste...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202290-MS
...Demand analysis description In order to further reduce the cost of system construction, combine cloud computing technology and network technology to build an offshore drilling cloud technology service platform, further integrate business resources, and strengthen the collaboration capabilities...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202396-MS
... in India's natural gas needs and the tightening of the LNG market. Project can be executed in a 6-year timeframe if bought on fast track with active government support as substantial preparatory work has already been done and continues. Pipeline construction will occur over a 2-year period. The project...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196401-MS
... with the approach adopted by operators in India, its benefits & challenges, risk associated & mitigation and the learning received by adopting the modular approach. Construction of facility in remote locations by modular approach not only results in saving of time & cost, but even increases...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-192138-MS
... engineers artificial lift team construction implementation availability Drilling workflow Introduction With the Oil business expanding day by day and with the demand for oil increasing many challenges were introduced, Kuwait Oil Company's South-East Asset (SEK) played a major role in tackling...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191911-MS
.... subsea system Engineering operational safety regulatory requirement operational readiness mooring system assessment module requirement Modeling & Simulation compliance operation topside module Upstream Oil & Gas FPSO construction society of petroleum engineers project manager...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191984-MS
... Project comprised construction of a two-train LNG plant, two 160,000 m 3 LNG storage tanks, a LNG loading jetty, and associated infrastructure on Curtis Island, near Gladstone, Queensland. The facility utilises ConocoPhillips’ proprietary Optimized Cascade ® process to liquefy natural gas. Project...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191955-MS
... was constructed in the mountainous area and shared with local communities. A pipeline network was established to transmit natural gas from Keshen gas field to the suburban areas of Baicheng and other remote places, which changed the local main fuel from firewood into clean natural gas. We hired local people...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186400-MS
... of simultaneous operation in Mahakam could be seen in 2013 operation, with more than 20 million manhours, 6 Jack up Rigs, 5 Swamp Barge Rigs, 36 Well Intervention barges, 22 Construction Barges were managed. This paper will describe specifity of simultaneous operation in Mahakam Block, and presenting improvement...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186900-MS
... Abstract SINOPEC has constructed the first commercial and scaled development shale gas field in Fuling of China, the annual productivity of which is 5 billion cubic meter until the end of 2015. And the other 5 billion cubic meter annual productivity construction of this shale gas field...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186914-MS
... and reclaiming the waste drilling fluid according to the situation. The field test results indicated that factory drilling could help increase rig operation efficiency, shorten well construction cycle, improve the comprehensive utilization rate of resources, and reduce the waste fluid discharge in the working...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186983-MS
... construction exploration exploitation tight oil reservoir production capacity Drilling Introduction The preliminary results of the latest resource appraisal show that the tight oil initially in place of China exceeds 40 billion tons and moreover China ranks the 3 rd all around the world in terms...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 25–27, 2016
Paper Number: SPE-182358-MS
... and stable production technologies, as well as studies on fine reservoir geology, so as to increase the effectiveness of oilfield development. In addition, efforts shall be made to expand profit growth from exploration of underground resources to aboveground construction, to establish multi-disciplinary...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 25–27, 2016
Paper Number: SPE-182473-MS
... Abstract In gas processing facilities, the minimum metal temperatures (MMT) in process equipment and piping are usually observed during highly transient depressurization operations ("blowdown"). The MMT usually sets the material of construction and can have a huge impact on project costs...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 25–27, 2016
Paper Number: SPE-182246-MS
.... Methods, Procedures, Process: This Code of Practice has been developed to help ensure that all onshore petroleum wells are constructed and abandoned to a minimum acceptable standard resulting in long term well integrity, containment of petroleum and the protection of aquifers. This Code identifies...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176470-MS
... the risk of degradation mechanisms arising from design, construction, installation and operations practices. Fundamental to the reliability of this methodology are the means to estimate the long-term degradation processes, such as corrosion, wear, fatigue and constructional disturbance...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176067-MS
.... This paper also reviews the major project and construction management challenges experienced in Indonesia. All information and data were acquired and gathered throughout a series of intensive monitoring with all Production Sharing Contractors in Indonesia: meetings, discussions, site visits and written...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 14–16, 2014
Paper Number: SPE-171441-MS
... Abstract Gaining competitive edge by managing construction risk Upstream Oil & Gas strategic planning and management practical application southeast asian yard risk management Construction Risk competitive edge project management programme rig consequence construction...

Product(s) added to cart

Close Modal