In Myanmar offshore, a substantially promising gas reservoir was discovered, the objective of primary cementing is to achieve long term zonal isolation, as any gas migration to surface would cause production loss, as well as significant security issues. Remedial cementing work will cause costly non production time, while the result will be compromised. Shallow gas migration, lost circulation and mud removal, all these factors cause undesired negative effects for cementing design, While the objective is to provide a firm barrier and good zonal isolation, this paper will describe in details the cementing challenge, the methodology, and how the slurry parameter was designed and evaluated for a Fit-For-Purpose solution.