Abstract
This article introduces the background and the methodology of a multidisciplinary reservoir engineering study that was carried out in Daqing Oilfield. The article focuses on the late stage of high water cut period multidisciplinary reservoir engineering study and the results of field application. The actual field application effectively improved the oilfield development and increased the recovery ratio.
Copyright 2004, Society of Petroleum Engineers
You can access this article if you purchase or spend a download.