1-8 of 8
Keywords: topsides
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-217062-MS
... the bridge structure along with the new topside. Considering the structural integrity of the existing platform, the bridge structure between the new and existing platforms is supported as a cantilever from the new platform, and therefore no load is transferred to the existing parent tower. The presence...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207547-MS
... platform design petronas pac subsea system specific requirement base design lightweight structure contracting strategy topsides operator bidder requirement flexibility catalogue reduction petroleum engineer Introduction - Design One Build Many Journey and Case for Change Design One...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207683-MS
... module arrangement cog topside petroleum engineer well bay area upstream oil & gas clearance offshore wellhead topsides topsides lateral movement Introduction Contractor executed an EPCI project in Mumbai High field in India involving decommissioning, removal, and replacement...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-208078-MS
... of different functionalities and an accommodation platform. Associated flare structures and interconnecting bridges were also installed as part of this project. Weights of the topsides in this project were varying from 7,000MT to a ∼32,000 MT. All these topsides were installed by float-over method using...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207741-MS
... Abstract This paper presents the latest developments in Transport and Installation methods for Topsides up to 38,500mt. For such heavy-weight structures Boskalis introduces a solution by combining the beneficial features of a Heavy Transport Vessel dry-transportation with the advantages...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192855-MS
... techniques used for various installations including Topside float over keeping focus on Safety, various technical aspects and cost effectiveness right from detailed engineering to installation phase. Considering availability of marine heavy lift vessels in the region and their day rates considering...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 10–13, 2014
Paper Number: SPE-171736-MS
... Abstract In recent years there has been a significant rise in heavy integrated Topsides for the new offshore fields in the Arabian Gulf. The Topside designs are increasingly becoming more complex and heavy. Installation of these decks through float over philosophy is the most sought after...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 3–6, 2008
Paper Number: SPE-117112-MS
... long lead item requirement recommendation conclusion execution society of petroleum engineers EPC contractor strategic planning and management execution plan procurement topsides brownfield project division reproduce integrity adma-opco approach midstream oil & gas adma-opco micro...

Product(s) added to cart

Close Modal