Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-13 of 13
Keywords: topside
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, November 4–7, 2024
Paper Number: SPE-222124-MS
... a specific project where an offshore jacket required an unsymmetrical extension to accommodate a new Topside (much large than the original due to enhanced facilities). It explores the methodologies used to assess the structural implications, including computational modeling. Special attention is given...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, November 4–7, 2024
Paper Number: SPE-222211-MS
..., primarily due to the volumetric surge of liquids in the Slug Catcher and the limitations of topside process liquid management systems. The complexity of this issue necessitated a thorough investigation and the development of a robust solution to displace the accumulated liquids and ensure an effective well...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-217022-MS
... society geology topside uae government information consolidation rig installation coefficient PLATFORM DESCRIPTION The facilities are designed for the wellhead platform type as summarized in Table 1 according to the production development requirements. Full drilling load case...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-217062-MS
... the bridge structure along with the new topside. Considering the structural integrity of the existing platform, the bridge structure between the new and existing platforms is supported as a cantilever from the new platform, and therefore no load is transferred to the existing parent tower. The presence...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207787-MS
... is installed after the jacket is piled to seabed. Since sequence of installation of boat landing is prior to that of Topside, such installations are straightforward and without obstructions from the Topside. For the bigger accommodation, production, process platforms located in super-complex (or standalone...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-208078-MS
... of different functionalities and an accommodation platform. Associated flare structures and interconnecting bridges were also installed as part of this project. Weights of the topsides in this project were varying from 7,000MT to a ∼32,000 MT. All these topsides were installed by float-over method using...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207683-MS
... module arrangement cog topside petroleum engineer well bay area upstream oil & gas clearance offshore wellhead topsides topsides lateral movement Introduction Contractor executed an EPCI project in Mumbai High field in India involving decommissioning, removal, and replacement...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197548-MS
... Abstract In this study, a detailed finite element analysis methodology of a 180 m deck cargo/launch barge B42 for 32,000 MT topside load is described and results are presented. Using Finite Element Method (FEM) for large welded steel structures such as a deck cargo/launch barge has been quite...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197150-MS
... ABSTRACT Float over topside installation has become a cost effective alternative for offshore construction over the past 25-30 years, as ever-increasing integrated topside weight constantly exceeds the lifting capacity of installation vessel cranes. The basic concept of float over installation...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192855-MS
... techniques used for various installations including Topside float over keeping focus on Safety, various technical aspects and cost effectiveness right from detailed engineering to installation phase. Considering availability of marine heavy lift vessels in the region and their day rates considering...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183093-MS
.... The differences in results for various actual project and potential impact on project schedule are presented in this paper. Typically, a transient simulation model includes wellhead topside piping, infield pipelines and a common manifold connection to the inlet of slug catcher to analyze the slugging behavior...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 9–12, 2015
Paper Number: SPE-177619-MS
... and constructed a re-usable platform L6-B of which foundation and topside has been installed in one go. The platform is located in the Dutch continental shelf and the existing L8-P4 installation is used as the receiving facility and host for the L6-B platform. An umbilical from L8-P4 platform provides the L6-B...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 10–13, 2014
Paper Number: SPE-171736-MS
... Abstract In recent years there has been a significant rise in heavy integrated Topsides for the new offshore fields in the Arabian Gulf. The Topside designs are increasingly becoming more complex and heavy. Installation of these decks through float over philosophy is the most sought after...