Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Date
Availability
1-13 of 13
Keywords: riser
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211101-MS
... in the shutdown subsea system, which will start to form once the NTT has expired. As a result, a single highly insulated pipeline system with an active pipeline heating system and monoethylene glycol (MEG) injection to the tie-in spools, well spool and manifold, riser, and riser base was the most viable subsea...
Proceedings Papers
Donatella Stocchi, Giacomo Zinzani, Andrea Lazzari, Giuseppe Leo, Paolo Giovanni Pasquali, Davide Flamminio, Fabio Iolli
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207285-MS
... plug water depth operation completion equipment time estimation intervention vessel cement plug reduction petroleum engineer vessel preparation upstream oil & gas riser well intervention vessel estimation preparation retrieval Introduction An increasingly integration...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-208092-MS
... networks at well sites, and offshore production risers. The methodology combines proven negative pressure wave (NPW) sensing with advanced signal processing to minimize false positives and accurately identify the presence of small spontaneous leaks within seconds of their occurrence. In the case of long...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203336-MS
... Unlike the drilling riser in connected mode, the freestanding drilling riser (FSDR) is not under the influence of heave loading generated by drilling vessel or platform motion and its top is at a depth below the water surface where the surface waves effect is negligible.Thus, the main lateral...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197219-MS
... Abstract The objective of the paper is to investigate the optimal riser configuration through a comparison of two different riser design automation frameworks based on multi-objective optimizations using a Random Forest (RF) based metamodel coupled with Evolutionary Algorithm (RF-EA) and Radial...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197246-MS
... X 8km length of CRA Full Well Stream (FWS) pipeline installed utilizing the (Dynamic Positioning) DP-2 pipelay vessel. The methodology applied in the installation is via typical S-lay utilizing automatic welding system (for the pipelaying) and stalk-on (for the risers at both sides of the platforms...
Proceedings Papers
Methodology for Recoil Analysis of Emergency Disconnection Drilling Riser in a Deepwater Environment
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197863-MS
...Mechanical Model Governing equation. Abstract In deepwater drilling, it is inevitable to disconnect the riser from the Low Marine Riser Package (LMRP) with the blowout preventer (BOP) under some extreme operating conditions. Since the riser is in tensile state under normal working...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197299-MS
... pipeline bundle sagbend overbend installation methodology reel-lay method pipeline requirement potential failure mode installation riser operation evolution Introduction Oil and gas have been the most affordable energy for decades. Exploration for oil started onshore in the early...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-182954-MS
... Abstract Risers are considered to be the most critical product in offshore pipeline development taking into account the dynamic loads and sour service conditions they need to withstand. The idea aims at providing a design where the riser is equipped with shock absorbent and thermally insulating...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 9–12, 2015
Paper Number: SPE-177942-MS
... transient behavior smart choke slug catcher flow rate controller lean workflow information feasibility study Engineer control system Upstream Oil & Gas separator riser workflow Choke Valve monitoring Implementation choke gas flow rate application valve operation remote monitoring...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 9–12, 2015
Paper Number: SPE-177787-MS
... Abstract A possible new development concept for Floating LNG may include a single flowline along the sea floor that splits into dual or more flexible risers. Since the gas co-produces condensate and water, design rules are needed for the splitting of the phases at the riser base manifold...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 3–6, 2008
Paper Number: SPE-117848-MS
... of two deep well pumps and two booster pumps capable of supplying the deluge system with 2500 Gallons per minute at 250 psi. Completion Installation and Operations strategic planning and management project management drilling operation platform riser Simop contracting company crane...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, October 13–16, 1996
Paper Number: SPE-36268-MS
... modifications would be required. P. 118 upstream oil & gas requirement separation and treating installation clamp gre line drillstem testing modification flowline wellhead platform bunduq offshore field operation platform central collector platform kevlar strap riser installationof...