Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Date
Availability
1-20 of 28
Keywords: lower completion
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Felix Leonardo Castillo, Mohamed Sarhan, Abd El Fattah El Saify, Victor Jose Aguilar, Roswall Enrique Bethancourt, Gennadys Ferrer, Alejandro Cortes, Bojan Bacina, Hartoyo Sudiro
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207327-MS
... the success of the well construction. drilling operation lower drain whipstock assembly swellable packer abu dhabi implementation multilateral well upstream oil & gas completion lower completion application directional drilling long string congested field assembly horizontal hole...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-208111-MS
.... production monitoring upstream oil & gas production control production logging sludge sample deposition separation and treating reservoir surveillance production engineering well performance inflow performance sludge deposition lower completion choke valve formulation diesel-based...
Proceedings Papers
Abdelhak Mohamed Ladmia, Hamdan A Alhammadi, Dr. Elyes Draoui, Dr. Kristian Mogensen, Fahad Mohamed.M Al Hosani, Graham Edmonstone, Ahmed Mohamed Aldhanhani, Faisal Jamaan Ballaith, Ayman Mohamed, Navindran Juvarajah
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207527-MS
... Abstract This paper presents a summary of the deployed Smart Liner- SL equivalent to the Limited Entry Liner- LEL as lower completion for the first time in a sidetracked Gas well, Offshore Abu Dhabi. R-1 is subdivided into several sub-layers, the reservoir properties are characterized by low...
Proceedings Papers
Andrew Edwards, Declan Tuffy, Kieran Sweeney, James Glennie, Farrukh Babazade, Bruce Robertson, Euan Murdoch
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203476-MS
... the lower completion to provide access to the reservoir, protection to a control line and act as part of the fluid-loss envelope. Remote activation technology has been implemented to the sleeve designs to improve efficiency and introduce operational flexibility. Three variants of sleeves were designed...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202914-MS
... stuck pipe incidents and mitigate them as much as possible. Experience accumulated from numerous lower completion deployments in deep slim-hole horizontal wells allowed the development of a dedicated risk matrix to minimize stuck pipe incidents. The resulting risk matrix incorporates the most...
Proceedings Papers
Abdelhak Ladmia, Abdulla Bakheet Al Katheeri, Graham F. Edmonstone, Sami Al Saadi, Eric Deblais, Dipankar Ghosh, Fahad Mustfa Al Hosani, Abdallah Abdulhalim, Fouad Abdulsallam, Haitham Mohamed Al-Khatib, Kevin Dean Mcneilly
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203013-MS
... to minimize field development cost by reducing well counts. Longer horizontal require lower completion liners to meet the objectives of the well. Full multi- disciplinary input are needed to properly install an effective lower completion, but robust design often brings strong performance. This paper describes...
Proceedings Papers
Baraka Said Al Afeefi, Saudyano Bong, Hammad Mustafa, Myrat Kuliyev, Sunil Chitre, Ahmed Khalid Bazuhair, Atul Kumar Anurag, Suvodip Dasgupta, Neil Sookram, Laurent Mosse
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203387-MS
... of high gas production. An integration of the various results from production logging, the pulsed neutron measurements, and open-hole and cement log data has helped in confirming the source of the produced gas. The acquired production log (PL) data revealed gas entry from the top of the lower completion...
Proceedings Papers
Al Anoud Alshamsi, Eglier Yanez Hernandez, Maher Zidan, Amnah Al-Sereidi, Subrata Sanyal, Ahmed Al-Harbi, Abhay Mudgal, Daniel Beaman, Leonque Rondon, Ben Butler
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202861-MS
.... This is the first Level 5 configuration installed in UAE integrated with a lower completion. The design enhances the benefits of the multilateral construction by providing full mechanical & pressure isolation at the junction throughout the life of the well. Furthermore, accessibility to both laterals from...
Proceedings Papers
Mukminin Yusuf, Pattarapong Prasongtham, Theeranun Limniyakul, I Nengah Nuada, Sawin Kulchanyavivat, Ajana Laoroongroj, Silpakorn Dachanuwattana, Rattana Watcharanantakul
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202896-MS
... simulation upstream oil & gas oil production lower completion inclination gulf fault block water production mubadala petroleum thailand Introduction to the Jasmine oil field The designation "Jasmine field" is commonly used to refer to both the Jasmine field and the neighboring Ban Yen...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203068-MS
... as they represent a big difference in AICD technologies. Best practice elements The ICT elements of a lower completion therefore ranges from the simple, mechanical rudimentary orifice devices, to advanced autonomous devices with mechanical design and flow characteristics that are tailor made to each...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203119-MS
... to bridge the gap between the upper and lower completion for both control and data flow. The method is a combination of two well proven systems, namely a cabled permanent downhole monitoring system that is connected to the surface with a tubing encapsulated conductor and instrumentation and control tools...
Proceedings Papers
Sunil Chitre, Hammad Mustafa, Atul Kumar Anurag, Ahmed Khalid Bazuhair, Myrat Kuliyev, Khalid Javid, Usman Anjum, Neil Sookram, Latifa AlHaji, Zaid Al-Kindi, Baraka Said Afeefi, George Jabour
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203144-MS
... Abstract This paper describes optimal field development and appraisal in complex reservoirs and challenging environments in field ‘ABC’. Most of the wells are laterals with ICD (lower) completions across heterogeneous carbonate reservoirs. Highly corrosive environments i.e. up to 20% H2S...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197351-MS
... designed and implemented a cost effective multi-zone completion (MZC) with selectivity and sand control. The completion was designed to fit in a 7" 23# casing and is comprised of a lower and an upper completion. The complexity of the lower completion; 4" sand screen as outer string, internal 2-3/8" tubing...
Proceedings Papers
Talgat Kosset, Olzhas Sissenov, Stanislav Novokshenov, Andrey Niverchuk, Mikhail Golenkin, Vasily Zvyagin, Renat Nabiullin, Afrand Dadashev
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197397-MS
... and temperature measurement completion systems on 3 ½-in. and tapered 3 ½ × 4 ½-in. tubing by using a wireless electric connect-disconnect system. completion equipment liner lower completion well 315 drilling operation friction factor slackoff friction factor completion system Upstream Oil & Gas...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197418-MS
... To achieve these goals development of plugged liner technology was initiated utilising Dissolvable Plugged Nozzle Assemblies (DPNA) for deployment with LEL lower completions combined with Remote Close Shoes (RCS). Plugged Lower Completion Benefits Abstract Earlier, SPE Technical Paper...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197489-MS
... as highlighted below. There is now a flow path from the reservoir to the tubing. Abstract The most common practice to deploy a lower completion with inflow control devices (ICDs) requires a washpipe assembly to facilitate deployment. Due to the nature of traditional ICDs, with open flow ports...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197968-MS
...Lower Completion Design considerations Abstract Objectives/Scope A new vision with new techniques of wells’ upper and lower completions have been applied successfully throughout a giant offshore multi-reservoir oilfield. Wells with long to very-long laterals have been completed...
Proceedings Papers
Sultan Dahi Al-Hassani, Ibrahim Mohamed Altameemi, Shafiq Naseem Ahmed, Owais Ameer Khan, Mariam Khaleel Al Hammadi, Hasan Mohammed Zakaria, Talha Saqib, Warren Fernandes, Sanathoi Potshangbam, Krishnan Saravanakumar, Syed Hassan
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197120-MS
.... Achieved a field record of the longest drain drilled with 8,500 ft. of MRC. The fit for purpose real time LWD measurements enabled successful placement of the lower completion and blanking the risk zones for pro-longed sustainable production. Identification of fracture zones in real time helped...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-193036-MS
... an engineered lower completion liner in order to deliver the required well performance that will adequately produce and sweep the reservoir. The engineered liner along with the extremely long laterals means significant time is spent switching the well from reservoir drilling fluid (RDF) non-aqueous fluid (NAF...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192659-MS
... for the RPU to perform ESP change out and running upper/lower completions (Re-completion) on existing wells that has ESP failures, or any recompletion opportunities. During the trial period, this new unit achieved similar operational efficiency to a HWU, while proving its capabilities to execute the most...
1