Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Date
Availability
1-20 of 140
Keywords: liner
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Mohamed Abdel-Basset, Yousef Al-Otaibi, Taha Blushi, Anood Al-Dhafiri, Majdi Al-Mutawa, Mamoun Abdelbagi, Ahmed Hadi
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211390-MS
...’ completion strategy from cemented liner to multistage completion. A successful expansion of Multi-Stage Completion (MSC) technology has been achieved on field level led by integrated team efforts since early 2020 to date. This helps to enhance overall well production potential, selective stimulation...
Proceedings Papers
Hamood Al-Hajri, Anees Al-Subhi, Fanis Khayrutdinov, Asaad Al-Busaidi, Ibrahim Al-Shukaili, Humaid Al-Abri, Zahir Al-Abri, Abdullah Al-Hadhrami
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211369-MS
... design was optimized including eliminating the use of permanent packers to achieve savings of about 5% in well cost at least 80% in well interventions. At early stage of the field life, combining drilling caprock and reservoir section and casing them with the same liner was considered as a good saving...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211324-MS
... to the top of the producing reservoir interval. In case multiple reservoirs produce across significant liner length (the liner here is the length/area between the two reservoirs), this "shallow" velocity string does not provide deliquification across the reservoir liner section. Depending on the size...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211133-MS
... 15k Multi-Stage Completion in Kuwait across Najma unconventional gas carbonate reservoir commingled with lower cemented liner completion in conventional Middle-Marrat tight carbonate reservoir. This completion configuration enables acceleration of selective stimulation and testing of Najma...
Proceedings Papers
Ali Salim Al Sheidi, Hatim Abdul Raheem Al Balushi, Zahran Ahmed Al Rawahi, Ahmed Saleem Al Harrasi, Deutra Mansur, Mohammed Malallah Al Farsi, Hilal Sultan Al Rubaiey, Nadir Ali Al Harrasi, Manish Kumar Choudhary, Cesar Orta
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211490-MS
...-a drilling fluid management & disposal production monitoring ncd liner reservoir surveillance enhanced recovery rcd bearing assembly migration ham reduction upstream oil & gas drilling fluids and materials drillstring design production control formation-a deployment courtesy...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211573-MS
... as the foundation for the successful drilling and cementing of the upper drain liner and for different completion runs. The downhole completion components that are permanently installed provide the capability for future reservoir monitoring and intervention to the laterals via coil tubing, wireline or slickline...
Proceedings Papers
Khalifa Omair Wahshi, Boris Jean Thomas, Saud Ali Khaldi, Younis Said Haji, Yasir Mohammed Salehi, Roger Shihche Yuan, Ali Khalfan Mahrooqi, Khalid Nasser Harthy, Fahad Said Habsi
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211735-MS
... weight after cementing the completion. This change enabled passing specific casing design burst loads associated with the reduction of the 7" liner weight from 35 to 29 ppf. This allowed drilling larger hole sizes of 6" and 6 1/8" instead of 5 7/8". H 2 S fugacity concept was used instead...
Proceedings Papers
Magdelene Jia Wern Lee, Eskandar Mohd Sukri, Muhammad Idham Adli Musa, Sheau Hun Ong, Muhammad Aizat Bin Abu Bakar, Harni Farihah Binti M. Safari Lai
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211729-MS
... enabling shallow reservoir development statically underbalanced mud reservoir characterization sbp petroleum engineer liner Introduction Located in offshore Sabah with average water depth of 1,100m, the field is planned to be developed with subsea wells targeting shallow formation of only 900m...
Proceedings Papers
Roswall Enrique Bethancourt, Mohammed Sarhan, Mazin Al Reyami, Peter Levison Mwansa, Basma Naeem Kodiah, Sneha Sam, Anchit Gaurav, Khaled Abdelhalim
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211745-MS
... more than 360-degree coverage of Casing/ Liner Inner Diameter (ID). When the drilling BHA (with activated SwD) is pull out to surface, the SwD simultaneously scraps the casing wall ID ( Fig 3c ), thus allowing the casing scraping to be completed in a single trip. A leading oilfield services...
Proceedings Papers
Kyle Ivar Jamieson, Joven John Ravelo Cayao, Paul Roderic Hazel, Bala Prasad, Sunday Michael Ibitomihi, Madan Kumar Kolakalapudi, Stewart James Thomson
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211555-MS
... clearance of 0.018″ between the burr and the seal stack. Figure 2 Design considerations of 6MEP ISP to prevent damage from perforation burrs The BSP well design and qualification required an MEP ISP to pass through a 7″ cement and perforated liner (TCP 5 shots/ft) deployed on a 3 ½" inner...
Proceedings Papers
Majdi Al-Mutawa, Ali Hussein Saffar, Mejbel Saad Al-Azmi, Fahad Barrak Al-Otaibi, Naser Bader Abdulmohsen, Mohsen Mohammed Ragaey, Joshi Girija Kumar, Abdulrahman Ahmad Alomar, Devendra Nath Tiwary, Ihsan Taufik Pasaribu, Khaled Al-Bannai, Djisan Kho
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211274-MS
... of a 6-in. open hole, which has remained opened for quite some time. Cement evaluation was required inside the 7 5/8-in liner to determine the cement quality behind the liner and integrity of liner shoe. This information is important for achieving a successful of multistage completion for the producing...
Proceedings Papers
Ting C. Roy, Kamel Bennaceur, Daniel Markel, Leonard Harp, Casey Harrison, James Shelton, Aaron Hall, Rashi Kashyap, Rosemary McDonald, David Groesbeck, Christian Wilkinson, Indranil Roy
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207697-MS
... bridged this technology gap through the synthesis of a novel alloy, which when cold isostatic pressed into a conical shaped charge liner enables a unique response. During the detonation event, the jet created from our novel degradable liner punctures the casing and progresses to penetrate the formation...
Proceedings Papers
Omar Nazih Jadallah, Mujahed Saleh, Mohamed Rebbou Benberber, Upadhyay Arvind, Zhanibek Diltaiyev, Vijay Himmatrao Suryavanshi, Ameen Al Kasasbeh, Samaawi Moslim, Ahmed Abdelraheem Abdelrahman, Mohamed Abdel Sattar, Yousefl Al Hammadi, Yousif Saleh Al Katheeri
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207759-MS
...-150 FPH. TQ & Drag real-time monitoring & intermittent pumping of 3 × 50 bbls weighted HVP to clean bit & BHA from cuttings were essential to avoid getting the pipe mechanically stuck. The 6,710 ft section was drilled successfully, Striped BHA Out of hole, Ran 7,160 ft of 7″ Liner...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207904-MS
... Displacement of completion or well fluid by acid is assumed to occur by single-phase plug flow with minimal dispersion, thus negative excess mixing volume is not considered. The end of the liner must be closed prior to stimulation and since the annulus is not cemented, adequate time for swell...
Proceedings Papers
Pasquale Pollio, Gianluca Fortunato, Salvatore Spagnolo, Gianni Baldassarri, Pasquale Cappuccio, Vincenzo Mittiga, Roberto Cherri, Marco Colombo, Salvatore Privitera, Riccardo Caldarelli, Manuel Ridenti, Yoann Santin, Julio Vasquez, Danilo Appicciutoli
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207447-MS
... installation and operations carbonate reservoir liner reduction cable upstream oil & gas abu dhabi international petroleum exhibition soluble abrasive material water production fracture pressure test ssd coiled tubing operations swellable packer intervention placement compartment...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207510-MS
... Abstract This study focuses on horizontal wells completed with pre-perforated liners installed in open holes, and which produce under sub-hydrostatic conditions. During workover operations, loss circulation materials (LCM) are routinely pumped, thus requiring coiled tubing (CT) cleanout...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207335-MS
... communication application petroleum engineer upstream oil & gas specification liner lower packer interpretation gre liner INTRODUCTION GRE lined tubulars have been applied in aquifer, seawater, and produced water injection, oil producer wells with or without ESP´s, Gas producer and gas...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207322-MS
.... According to well inflow calculations, using the most suitable pump, the correct amount of liquid from each reservoir has been produced during these operations. production control upstream oil & gas protector reservoir surveillance liner rotation shaft protection artificial lift system...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207305-MS
... the development, testing, qualification, and deployment of the plugged liner technology using the dissolvable plugged nozzles (DPNs). The use of DPN plugged liner technology has resulted in CAPEX savings and enhanced production performance. The benefits of DPN technology are its simplicity along with its cost...
Proceedings Papers
Mohamed Abdel-Basset, Yousef Al-Otaibi, Abdulla Al-Saeed, Taha Blushi, Erkan Fidan, Majdi Al-Mutawa, Mamoun Abdelbagi, Ahmed Hadi
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207705-MS
... gas wells’ completion strategy from cemented liner to multi-stage completion. Successful expansion of Multi-Stage Completion (MSC) technology is achieved at the field level led by the integrated team efforts in 2020/21, despite challenging constraints of COVID-19. MSC's help to enhance overall well...
1