Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Date
Availability
1-2 of 2
Keywords: hydraulic workover unit
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197351-MS
... with sliding side doors (SSDs), seal bores and packers, made deployment a challenge with a hydraulic workover unit due to the limitations of stroke length and gin pole. The completion equipment were selected based on workover operations pipe handling constraint, i.e. stroke length, gin poling hanging weight...
Proceedings Papers
Shahril Yang, M. Hatta M. Yusoff, Ismail Aslam Abdullah, M Ikhranizam M Ros, Lingges Devadass, Azmi Othman, Thore Andre Stokkeland, Parker Matthews, Abdul Karim Sainuddin
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197149-MS
... was that two zones had to be isolated in one run. The distance between the two zones was almost 100 meters. A significant challenge, with a significant upside. The execution was using Hydraulic Workover Unit (HWU) and overall 14 plugs completed (for 14 wells). Methods, Procedures, Process The method has...