1-12 of 12
Keywords: fabrication
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-210798-MS
... of their exceptional strength and corrosion resistance. However, they add to manufacturing and fabrication complexity. One of the keys to successful commissioning and start-up of the facility is the proper storage and preservation of materials and equipment. To maintain good preservation, an effective preservation...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207246-MS
... This cost comparison calculator has different worksheets for to estimate the installation and CQC cost difference between factory and field fabricated geomembranes. The cost comparison includes shorter site time, less field seaming, sampling, testing, reduced installation crew expenses...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203104-MS
...Introduction When casting is chosen as fabrication method for pumps components, than manufacturing process is normally managed by Vendors through specialized foundries which are technically qualified to NORSOK standard M-650. Cast SDSS products are specified complying with ASTM standards...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197655-MS
...-check requirements (API RP 2A or ISO 19902). Most of the steel structure can be fabricated and assembled at onshore and transported to designated location based on lifting capacity of the installation barge/vessel crane. The partial jackets, pile segments, deck framing and other loose items can...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-193170-MS
... and Fabrication of calibration block Design and fabrication of calibration block plays a vital role in the AUT inspection process. The design of calibration block depends on the actual bevel configuration of the pipeline weld as per the welding procedure and is made from the specific project pipe material...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183096-MS
... of pipes, Stringing of pipes, Installation of pipes, Installation of flow lines, Welding and NDT of Pipelines, Field Joint Coating of pipelines, Trench Excavations, Sand Badding and Backfilling, Installation of pipe crossing, Construction of Gatch Berm, Tie – in of pipe section, Fabrication...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183218-MS
...), makes the presence of CO 2 to be a coorosion driver in the pipeline. Therefore, such pipeline operation is considered to be more complicated than any other service pipelines. This paper will represent the joint research conducted in Masdar Institute and ADCO, which deals with the fabrication...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183044-MS
... was within the hazardous area close to live Plant units, tank installation was required to be carried out within the shutdown period. This triggered the development of a novel approach for a modular fabrication of tank, transportation in parts and installation strategy, to maximize pre-shutdown activities...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 10–13, 2014
Paper Number: SPE-172092-MS
... life failures, it was found there were a number of examples of "common" factors in the investigations. These were noted in all "life cycle" stages: Upstream Oil & Gas exceptional condition Downstream Oil & Gas fabrication new equipment fail Artificial Intelligence inspection...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 3–6, 2008
Paper Number: SPE-118199-MS
... strategic planning and management specification early stage objective quality system Engineering fabrication inspection class procedure systematic approach method statement verification society of petroleum engineers phser Introduction Over the past 25 years, demands for quality have...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 11–14, 1998
Paper Number: SPE-49507-MS
... of rejuvenation, by means of breathing support and complete overhaul of the nervous system; it also had to give up smoking. procurement installation platform tie-in abu dhabi fabrication operation engineering major revamping project spe 49507 shutdown modification minishutdown construction...

Product(s) added to cart

Close Modal