1-20 of 38
Keywords: drill pipe
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-208010-MS
... environment. It therefore provides valuable input for decisions of future use of industrialized robots in the oil and gas upstream industry. upstream oil & gas roughneck offshore test drill floor drilling operation drill pipe robot test facility land rig robotic pipe handler artificial...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207252-MS
... assembly after drilling to the total depth. The study aims to analyze root-causes of the hard backreaming through the carbonate reservoir in the studied field. The speed of tripping-out was analyzed every stand of drill pipe by using time domain data of movement of traveling block. The correlations between...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207435-MS
... Abstract High-speed wired drill pipe and its corresponding communication technology not only can achieve high-speed transmission rate and high-capacity, but also can realize real-time monitoring and dual-way communication in whole section, which can prevent downhole problems effectively...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202974-MS
... Abstract Unmanageable losses through carbonate formations led to pumping water through the drill pipe and heavy mud cap in the annulus to drill with total losses. Although this technique overcomes the need to fly mix drilling fluid, it adds the complication of pumping heavier mud cap...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203170-MS
.... production control drilling fluid management & disposal drilling fluid chemistry well control saudi arabia government production monitoring reservoir surveillance fluid loss control drilling fluid property annular pressure drilling temperature distribution upstream oil & gas drill pipe...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203473-MS
... down both the 5-in. drill pipe and the 4-in. pipe on most wells. In addition, the tapered string required to test the BOP on two pipe sizes along with changing of the saver sub and pipe handing gear. The operators drilling team therefore decided to evaluate the option to mobilize a 5½-in. drill...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197123-MS
... avoidance to name a few. The project drilled longer wells at less costs. This approach has resulted in drilling and completion of wells comfortably within the equipment-rating envelope. Additional technological means such as newly developed lubricant and mechanical drill pipe torque reducer subs helped...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197167-MS
... Abstract Nearly one third of the drilling time lost is caused by stuck drill pipe. In many cases, stuck pipe is preventable if early signs are detected and timely measures are taken, particularly for stuck pipe events caused by solids (primarily drilled cuttings) in the wellbore. This paper...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197549-MS
... relation Simulation ERD well sensitivity analysis Upstream Oil & Gas friction factor application dht sensitivity drilling operation drill pipe DHT society of petroleum engineers downhole temperature management downhole temperature rheology Introduction The complexity of the oil...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192909-MS
... fluids and materials flow rate experiment drilling operation information BHA drilling fluid management & disposal drill pipe pressure chamber hi-vis pill nozzle circulation batch temperature profile recovery rate dynamic temperature field experiment iii field experiment microchip...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192914-MS
... to rotate the lower part of completion or if there are chances of having obstructions due to hole condition/geometry. completion equipment Simulation lower completion Upstream Oil & Gas swell packer liner hanger torque icd Directional Drilling drill pipe completion rotation society...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192966-MS
... log analysis drill pipe data source well logging right data operation Artificial Intelligence data acquisition strategy Dawson right place vertical well gauge probability data acquisition plan block 61 horizontal well right time information management Introduction Data...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192953-MS
... Oil & Gas drill pipe hole section hole size Artificial Intelligence lateral well construction cost penetration rate slim hole friction transition slim hole drilling Drilling drilling operation slim hole well Well Design reduction society of petroleum engineers vibration...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192644-MS
.... rig power system AC drive voltage loading Upstream Oil & Gas variation operation loading percentage Drilling Equipment generator harmonic distortion rig waveform inductance drill pipe drilling operation drilling drive harmonic problem inductor power system Chapter I...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192791-MS
... Directional Drilling BHA Sultanate reservoir Well Design optimization action project field record artificial intelligence drill pipe ROP improvement Drilling Dynamic Oman real time system drilling operation rotary steerable system penetration drilling performance procedure Drilling...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192632-MS
... key elements that will be useful for the planning of similar operations in other wells in the future. TTRD revolution Upstream Oil & Gas well 34 total depth toolface drilling operation drill pipe rotary mode whipstock objective axial vibration tool bottom hole assembly through...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192672-MS
... must play a role to reduce cost, increase efficiency and ensure safety at all times. Conveyance is the key for any data acquisition and well completion activities. Historically, conveyance methods for data acquisition and perforation in highly deviated or horizontal wells required drill pipe or coiled...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192673-MS
... Abstract A world leading ERD project was required to make a step change in drilling performance to reduce the well construction duration. An opportunity was identified to minimize invisible lost time due to handling a tapered string combing two sizes of drill pipe. The objective was to design...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188832-MS
... of 56 days, saving more than 15 days and $3.2M. zonal isolation drill pipe Drilling Operation Optimization new design construction Upstream Oil & Gas well integrity liner milling operation new well design drilling operation Well Design target reservoir thamama-i formation...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188865-MS
... Aluminum has begun to see new potential in extending the horizontal reach of shale wells. For example, a 5in. aluminum drill pipe weighs 32 percent less in air than a comparable 5in. steel drill pipe and is a remarkable 54 percent lighter in mud weighing 10 pounds per gallon (ppg). This reduction...

Product(s) added to cart

Close Modal