Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Date
Availability
1-2 of 2
Keywords: conventional cement
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192863-MS
... for enhanced isolation and annular pressure buildup mitigation. wellbore integrity Upstream Oil & Gas activation energy Wellbore Design annular sealant cement and bond evaluation resin resin-cement composite conventional cement society of petroleum engineers mechanical property resin...
Proceedings Papers
Abdulla Faleh Al-Dossary, Abdulasalm Al-warthan, Mohammed Al-Badran, Ibrahim S. Al-Ghamdi, Wessam Mutawaa
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188478-MS
... bbls) were pumped with OEDP three of which were quick setting (QS) cement while the rest was conventional cement. Each time "squeezed off leak" was pressure tested to 300 psi, pressure dropped to 150 psi in less than 15 mins with no change on injection rate. The last cement plug was squeezed...