1-20 of 123
Keywords: contractor
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202784-MS
..., considerable savings were made by utilizing the DIR contractor's personnel and equipment instead of building bespoke compressor stations. Further significant operational savings were made as the envisaged annual maintenance of the compression facilities in Qatar and UAE were significantly higher than...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203300-MS
... existing equipment and processes for BOPE testing on the rig in October 2017, at the start of deployment, were considered standard for most remote drilling operations. The drilling contractor supplied a high-pressure, low-volume pump with manual controls. A bourdon tube pressure gauge was used by the pump...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203215-MS
... investment decision. strategic planning and management engineering objective requirement upstream oil & gas assessment investment decision artificial intelligence fel stage contractor project complexity fel phase cost overrun execution construction project team project management...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203241-MS
.... To ensure the safe and minimized risk installation operation of Slip over jackets at the existing offshore filed, the cost effective installation methods were devised and implemented to have the successful installation of slip over jackets. These installation strategies help EPC contractor achieve...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203254-MS
... invaluable when handing over systems to client/operator. Abstract Oil and gas projects often experience delays in startup due to an ineffective transition from construction to commissioning and startup activities. Traditionally, engineering, construction and procurement (EPC) contractors are...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203110-MS
... development offshore project strategic planning and management planning & scheduling brownfield project cost project management upstream oil & gas schedule delay requirement project cost & schedule optimization construction contractor cost overrun brownfield project asset and...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202734-MS
... Abstract One of the major challenges of oil and gas mega projects is the claims management process. This paper will discuss how claims, which arise during the lifecycle of a project, can be managed by both the contractor and by the procuring entity. This is particularly relevant to the industry...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203003-MS
... project contractor petrochemical project contracting strategy line item Projects in petrochemical industry require total integration, sustainability, significant financial and human resources to execute. As the nature of projects is usually complex and Contractors who execute petrochemical...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203067-MS
... well density respectively. The influence of well density on contractor's profit was further investigated. Finally, the proposed method and investment income analysis model were used in a specific oilfield of the Middle East, which shows that the contractor's profit monotonically decreases with the...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202873-MS
... across the long-term drilling campaign, and chose TWMA's thermal processing technology as its onsite waste treatment solution. Recovered oil was returned to the drilling contractor for reuse and the remaining treated waste streams (water and inert solids) slurrified for injection into a disposal well...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202972-MS
... management data quality contractor technical limit transmission rig site workflow real time data management system digital tool upstream oil & gas operation kpis well operation predictive algorithm well construction process application algorithm witsml server Data is an asset...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202734-MS
... Abstract One of the major challenges of oil and gas mega projects is the claims management process. This paper will discuss how claims, which arise during the lifecycle of a project, can be managed by both the contractor and by the procuring entity. This is particularly relevant to the industry...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202784-MS
... & gas offshore pipeline connector gas pipeline pipe section contractor dolphin energy operation dir contractor subsea pipeline midstream oil & gas pipeline isolation plug lrit subsea launcher & receiver dir operation control system requirement personnel Dolphin Energy...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202839-MS
... hazardous waste fpso contractor water management flowline disposal management plan abandonment tank chain section waste water retrieval execution operator subsea system solid waste management assessment requirement temporary well suspension riser disconnection An oil field that...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203431-MS
... representatives, etc. from several EPC contractors and clients. There are several causes of EPC projects delay and cost overrun and every project may have its own challenges but many found to be common among projects. Sometimes, it may be a single trigger event that leads to delays or a combination of events...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202626-MS
...) resolve major supply chain issues relating to quality and productivity. With this presentation we describe successful responses to our challenges that have improved CAPEX efficiency by over 30 percent when successfully applied. project management project data stream fel 2 contractor strategic...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202601-MS
... project management platform package contractor strategic planning and management upstream oil & gas petronas objective contractor enhanced recovery icsu strategy commissioning and startup oil production execution integration complex facility engineer injection handover...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202669-MS
... effectiveness of the training that will be provided to the workforce and ultimately supervisory competence and knowledge. knowledge evaluation hse manager safety golden rule sca tool training session contractor personnel assessment self-assigned score subsidiary additional question upstream...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203071-MS
... contractor scenario construction work milestone The operating company in this case study is primarily involved in development of the marginal fields within its concession area in the emirate of Abu Dhabi, UAE. The current case study covers the successful application of principles of agile project...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203110-MS
... common risk to brownfield projects. The existing facilities are governed by operations and strict work-permit and safety procedures are applicable at work sites because of live-operation. It is a major task for the PMT and contractor to apply and get approval for work permits for their various activities...

Product(s) added to cart

Close Modal