1-20 of 327
Keywords: completion
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-210798-MS
... these defective items, which can delay the completion of the project. Super duplex stainless steel is a sensitive material comprised of two metallurgical phases. For it to maintain its toughness and corrosion resistance properties, stringent testing and welding controls are required. Abstract Quality...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-210924-MS
...% of these development plans has been successfully completed. The drive, needs and benefits behind having these development programs in place are: Abstract People Development Breakthrough Strategies for Staff Development Objectives/Scope: Please list the objectives and/or scope of the proposed paper. (25...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211438-MS
... the efficiency and success of polymer flood mechanism. All polymer injector wells were completed with smart completion that allows selectively opening and closing specific segment of the well. Each smart completion has four segment each on average and measured of hundred meters in length each. In addition, each...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211253-MS
... decision. gas injection autoboost completion application operation reservoir upstream oil & gas artificial lift system installation spe-211253-ms rapid production module well completion selection gas lift system petroleum engineer deliverability gas lift real time system...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211313-MS
... in the region by demonstrating how a multilateral well strategy reduces time-intensive operations by eliminating additional vertical wellbore sections and utilizing existing infrastructure. The case study will include discussion of workover intervention operations, completions, and lateral creation systems...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211325-MS
... architect (short horizontal vs. MRC/ERD vs. deviated), well completion, well productivity/eruptivity and for water injection as it is the first time to inject water in this type of reservoirs water injectivity, water quality, scale risk..etc. So, a dedicated de-risking plan was introduced & implemented...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211341-MS
... Abstract Managing retrograde gas condensate reservoirs comes with its set of challenges. To maximize recovery and ensure the sustainability of reservoirs, the reservoir engineer must ensure the proper well placement, choose the best completion, and perform regular reservoir surveillance...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211320-MS
... Abstract Lower completion in openhole horizontal well is known to improve oil sweep, aid water control and water shut-off in carbonate reservoir. In a marginal oil field of onshore Abu Dhabi, lower completion is an important role to achieve the long-term recovery and production sustainability...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-210881-MS
... loading management occurred flaw upstream project selection fel-3 petroleum engineer agreement investment completion Introduction Al Dhafra Petroleum Operations Company Limited, is a joint venture between ADNOC and KADOC established in late 2013 and assigned with Onshore and Offshore...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211496-MS
... application process. The ICD screens were deployed and filter cake was removed with a minimum delay of one hour to prevent needless losses that could end up with catastrophic well control situations or excessive non-productive time trying to cure the losses to continue with the completions operations The new...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211539-MS
... higher reservoir production with an open hole completion design. This paper describes the process for qualification for the OCIEF. The paper further describes and summarizes the successful field deployment of the OCIEF to date. Formulation of low ECD OCIEF (Organophilic Clay Free Inverted Emulsion...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211543-MS
... of the sensor ball within programmed time Complete data recovery from the sensor ball upon retrieval Accuracy of recovered data compared to wireline surveys below 5% average absolute error The comparison results of the sensor ball and wireline data at both water wells showed consistency and accuracy...

Product(s) added to cart

Close Modal