Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 22
Keywords: clearance
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-217069-MS
... these challenges, adjustments were made to the height of the bridge stabbing pin to increase clearance between the cellar deck (final location) and the helideck. Installation aids in the form of carefully positioned guides and bumpers at the cellar deck level were used to prevent the bridge from moving towards...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-217062-MS
... Construction Company (NPCC). It provides information on the challenges involved in topside installation adjacent to the existing platform and how it contributes to environmental mitigation. subsea system bridge topsides cone upstream oil & gas platform clearance requirement rotation asia...
Proceedings Papers
Teh See Yee, Raja Sharifuddin Ahmad B. Raja Badrol, Noor Hidayah Shaharuddin, Amirah Bt C. Zakaria, M. Norfisyah B. Alifah, M. Syaifullah B. M. Azali, M. Aziehan Mat Kasah
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-216278-MS
.... This paper will elaborate the entire decommissioning process and its challenges in all the phases, including wells abandonment, pre-abandonment survey and data gathering, engineering, decommissioning, structural removal and transfer, disposal, and final site clearance. The engineering study, cutting tools...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-210842-MS
... single lift offshore facility decommissioning north america government regulation operation complete removal pipeline expenditure clearance Pipeline Removal Topside (Single lift vs Multiple smaller lifts) Typical activities involved in the preparation of topside removal include...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211155-MS
... reservoir surveillance production monitoring upstream oil & gas sulphur compressor production control gas injection compressor artificial lift system cylinder gas injection method enhanced recovery sulphur deposit ga manifold particle shutdown petroleum engineer labyrinth clearance...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207683-MS
... module arrangement cog topside petroleum engineer well bay area upstream oil & gas clearance offshore wellhead topsides topsides lateral movement Introduction Contractor executed an EPCI project in Mumbai High field in India involving decommissioning, removal, and replacement...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207787-MS
... landings onto recently installed Greenfield platforms in Arabian Gulf using efficient rigging, suiting the EPC Contractors’ crane assets. upstream oil & gas installation scheme platform design national petroleum construction company dummy leg offshore subsea system clearance operation...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-208078-MS
... various installation engineering analyses required during design stage. Float-over installation of the gas treatment platform was carried out by the conventional load transfer method (by ballasting) and using normal spread mooring arrangement. subsea system clearance deflection requirement asset...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203107-MS
.... gas processing circulation circulation rate modeling & simulation gas monetization clearance condenser 2 vapour liquified natural gas upstream oil & gas shell side cfd simulation sulphur condenser exchanger representation compartment operation lng heat transfer condenser...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203129-MS
... inboard bearing failure occurred with the same characteristics based on the previous history, this plan was implemented: Fan bearings’ housings clearances measuring. Old (failed) bearings visual inspection. Fan inboard bearing replacement. Modal impact test to measure the fan natural...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203250-MS
... liability solution society of petroleum engineers clearance offshore installation requirement pipeline operator cargo barge marine environment regulation complete removal Abstract The objective of this paper is to provide an outline of current decommissioning guidelines andtypical practices...
Proceedings Papers
Salomone Andrea, Ferrara Giovanni, Pederiva Emanuele, Gioia Valeriano, Concas Antonio, Tomassetti Valerio, Kenneth Hodcroft, Honore Sendel, Jonathan Roche, Daniel Agee
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-202736-MS
..., producing a total of six gas bearing zones. The topmost zone produces from the short string while the rest of the zones produce through the long string. Some of the challenges were: Narrow screen-casing clearance causing increased risk of bridging and early screen out Small ID tool and workstring...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203102-MS
... LNG and manufacturer successfully. Main implementations are blade coating, upgrade of air filter elements and blades tip clearance optimization. The recommended enhancements were implemented and successfully arrested the risk of blades liberation to assure gas turbine integrity and sustainable gas...
Proceedings Papers
Methodology for Recoil Analysis of Emergency Disconnection Drilling Riser in a Deepwater Environment
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197863-MS
... Disconnection mud discharge tensioner clearance riser DAT drilling mud Frictional Resistance maximum clearance disconnection drilling riser stiffness Introduction In deepwater drilling, emergency disconnection of riser from the LMRP is inevitable in the case of some unpredictable factors...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197150-MS
... Portable DP Vessel. surge fender clearance jacket structure subsea system DTV fender topside Upstream Oil & Gas thruster sway fender fender elastomer guideline jacket leg transportation installation interaction bncpp-b topside platform operation portable dp vessel stiffness...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188182-MS
... to include the size of radial clearance, rotating speed (RPM) and pump hydraulics. Assuming the cutting and mud smearing to be the result of point contact forces altering the near-wellbore stresses (confining stresses), the above parameters cause a repeated but unsynchronized invasion of particles...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188361-MS
.... Non-premium or semi-flush casing connections, small annular clearances and spool type wellheads have been notorious weak points in well barrier envelopes of previous designs. Standard MLS systems are not suitable for the re-entry phase of such a complex well. The operator engineered a new casing...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188600-MS
... radio clearance (Fresnel Zone), plot of the radio transmission link and to visulize results of the radio link budget. Complete calculations equations of this software are provided with detailed radio propagation analysis sample results of the studied oil collection pipeline network, to permit more...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-182887-MS
... through distributed temperature-sensing analysis. Upstream Oil & Gas orientation Completion Installation and Operations clearance detonation shock load deployment system application perforation society of petroleum engineers disconnect selective-landing nipple connector intelligent...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 9–12, 2015
Paper Number: SPE-177607-MS
... drilling tools. real time system Coiled tubing operations drilling operation clearance Germany ROP Completion Installation and Operations Bottomhole Assembly turbodrill turbodrill bottomhole assembly northern germany technical limit drilling Upstream Oil & Gas positive displacement...
1