1-20 of 20
Keywords: barge
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-216356-MS
... In addition to the complexity of the riverbed, another constraint that had to be considered during planning involved the seasonal river level, which allowed only a 10-week operational window when the barges could navigate through the river. Therefore, before execution, studies such as soil...
Proceedings Papers

Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-217050-MS
... transporting the jacket and piles on a cargo barge and installing them using a simple, dual block lifting system with or without upending clamps on the barge. However, when dealing with large diameter monopiles, the transport barge can only accommodate two of them. At offshore, these monopiles must be shifted...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207787-MS
...) with topsides installed by float over method, boat landings sometimes are in the wide float over barge slots. In such cases, installation of boat landing becomes very critical due to the post installation after the Topside and associated obstructions from the Topside. This is similar or more critical than...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-208078-MS
... contractors own cargo /launch barge fleet. Gas treatment platform topside installed as part of the above project is the world's heaviest single-module topside Installed by float-over on a fixed steel jacket. Float-over is the process of installing the topside on a preinstalled jacket by ballasting...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207741-MS
... of a DP2 Barge float-over installation. This unique Transport and Installation approach, a so called "Piggyback T&I", may be characterized as follows: upstream oil & gas piggyback dry-transportation barge dry-tow subsea system boka vanguard operation marine transportation ballast tank...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207683-MS
... of different installation aids to facilitate demolition etc during successful execution of Brownfield works in Mumbai High field by National Petroleum Construction Company (NPCC). enhanced recovery platform demolition laser scan model barge information contractor engineering christmas tree...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 9–12, 2020
Paper Number: SPE-203250-MS
..., drawings and other up-to-date information which reflects the actual field condition. Introduction offshore facility decommissioning upstream oil & gas us government barge mobilization regulatory requirement convention abandonment single lift selection well plug derrick barge...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197548-MS
... Abstract In this study, a detailed finite element analysis methodology of a 180 m deck cargo/launch barge B42 for 32,000 MT topside load is described and results are presented. Using Finite Element Method (FEM) for large welded steel structures such as a deck cargo/launch barge has been quite...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197582-MS
... construction construction worker individual risk risk reduction risk-based approach Production Chemistry barge Island eni Simop society of petroleum engineers Introduction Hydrogen sulphide is a very toxic gas which, at low concentrations, may cause harm to people, ranging from loss of sense...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192855-MS
.... This was mainly to avoid any welding and grouting requirement. For the float over, unique LMU (Leg Mating Unit) were fabricated in Caspian and Transportation barge was assembled in Caspian region with capacity to launch 4,000 mt jackets and install 6,000 mt topsides. These customized installation...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183523-MS
... log analysis production enhancement light well intervention downhole intervention barge cantilever solution pipe requirement cantilevered workover solution completion operation society of petroleum engineers well logging Upstream Oil & Gas cantilever system drilling rig coil...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183220-MS
... involved Building, Transportation and installation of approximately 270 Structures required to complete the Offshore construction of UZ750 EPC1& EPC2 Projects. supply chain management inspection Upstream Oil & Gas artificial island barge marine warranty surveyor fabrication yard...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183233-MS
... The Jack-Up Accommodation barge complies with the Flag State, Class, National SOLAS, IMO MODU CODES regulations. It has sufficient leg length to be able to jack up to the platform top deck which is at a height of 27 meters from sea level. The accommodation Jack-up operates at 12.5 meter deck...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 10–13, 2014
Paper Number: SPE-172165-MS
... of entry into congested area, specification of Marine Vessel which could be Dynamic Positioning (DP-2), clear identification of interfaces, roles and responsibilities between the Barge, Marine Vessel, and the Offshore Installation. 1.7. Marine Field Charts It was observed that there was a presence...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 10–13, 2014
Paper Number: SPE-171736-MS
... in comparison to modularized lifting of the topside. Float over is an operation of mating of a topside structure, carried on a cargo barge, to a fixed (jacket) substructure. Normally the layout of the jacket and topside are designed such that it will be suited for a specific barge size in mind. The selection...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 3–6, 2008
Paper Number: SPE-117996-MS
... production/injection losses due to offshore rig and barge activities, and HSE enhancement, as well as introducing new technologies to add values to our field development become major challenges for our well construction team composed of ZADCO (Zakum Development Company) and ADMA-OPCO (Abu Dhabi Marine...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 5–8, 2006
Paper Number: SPE-100754-MS
... challenge to ADMA-OPCO. Accurate accounting of the field sustainable capacity/ development plans, strict compliance with good reservoir management guidelines/ practices, excellent planning of field activities (operations & maintenance, projects, rigs & barges, reservoir monitoring) and vigorous...

Product(s) added to cart

Close Modal