1-5 of 5
Keywords: abandonment operation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211160-MS
.... Conventionally, well abandonment operations are performed by cementing the wellbore utilizing a drilling rig and its facilities, which is the main driver for the relatively high P&A cost. Here is where the method/initiative of "Rigless abandonment" came into play. This technique replaces the use of drilling...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197149-MS
... Abstract Objectives/Scope Perforate, Wash & Cement (PWC) is a method developed over the past decade to help increase efficiency in plugging & abandonment of wells. The method has helped operators world-wide to save time and cost in plugging and abandonment operations by cutting down...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188339-MS
.... the process is regulated per the original terms of lease, and is subject to a variety of global, regional, country, and company-specific standards. Below is an overview of the phases of well abandonment, for operations. Drilling Equipment Upstream Oil & Gas subsea system SWC abandonment operation...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188176-MS
... The objectives of all abandonment operations is to achieve the following: Abstract The inevitable depletion of oil and gas reservoirs beyond economic viability requires Permanent Well Abandonment (PWA) as per the applicable regulations to isolate in perpetuity all freshwater and hydrocarbon...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 7–10, 2016
Paper Number: SPE-183255-MS
... simultaneous operation consideration rig cantilever drilling jack-up drill floor abandonment operation plug drilling operation technical limitation cantilever dayrate Efficiency development drilling Cantilever drilling SmartCrane operation drilling contractor society of petroleum engineers...

Product(s) added to cart

Close Modal