1-11 of 11
Keywords: Acceptance Criteria
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211553-MS
... drilling operation enhanced recovery collet mechanism collaboration valve assembly safety valve completion equipment sand control mechanism exposure criteria developer single-trip completion technology development pba hcl acid supplier fixture acceptance criteria Introduction...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207579-MS
.... As this analysis was non-conventional, there is no well-established industry acceptance criteria for the analysis results. Hence, an acceptance criteria was jointly developed with Contractor, which is fundamentally the minimum number of screws per panel, required to be intact, during the 2 year period, to confirm...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197707-MS
... when exposed to fire. FRA is an exhaustive study requiring detailed inputs such as type of fire, fire duration, vessel / pipe thickness, yield stress of material, heat flux, rupture acceptance criteria, in addition to inputs considered in conventional approach. FRA approach evaluates rupture...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-193158-MS
.... in the Arabian Gulf and Gulf of Mexico, the consequences, not only economic but also safety wise, of a severe interference, might be relevant. The shallower the water depth and busier the area, the more stringent the safety targets. Sometimes, even having met acceptance criteria, backed by competent engineering...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192665-MS
... of PWHT shall be evaluated by demonstrating an alternate method using fracture mechanics duly supplemented with engineering assessment. Results from the case study substantiated by detailed engineering critically assessment (ECA) show that the acceptance criteria can be achieved without the requirement...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188300-MS
... operator Upstream Oil & Gas pipe wall steel Acceptance Criteria hydrogen partial pressure Welding Introduction It is not new that internal corrosion may be of major concern for field development projects. Actually, what is noteworthy is the large amount of care that offshore Oil&Gas...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188615-MS
... a user's objective in downhole conditions. T H Hill worked with oil field service providers to develop specific procedures and acceptance criteria for the inspection of bit bodies, cutting elements and the threaded portion (connection) of a bit. The drafted standard was then released for review...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 9–12, 2015
Paper Number: SPE-177795-MS
... and developed an Internal Commissioning & Hand over strategy as follows: At FEED stage of the project, all Commissioning requirments, Start-Up sequence, Performance Test Run requirements & Acceptance criteria are identified and ensured that the same are embedded in EPC scope of work. At early stage...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 1–4, 2010
Paper Number: SPE-138712-MS
.... It also concerns the Preparation of a methodology that can be used to provide a consistent minimum reliability (against environmental overload) for offshore platforms located in different regions around the world and which is referred to as Regional Acceptance Criteria (RAC). As a member participant...

Product(s) added to cart

Close Modal