1-12 of 12
Keywords: Acceptance Criteria
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the ADIPEC, October 2–5, 2023
Paper Number: SPE-216118-MS
... meet pre-agreed acceptance criteria. The IPM approach is a typical example of an Outcome Based Contract. In such contracts there are minimum client/ contractor interfaces, and the contractor has a vested interest in optimizing performance as payment is linked to pre-defined acceptance criteria...
Proceedings Papers

Paper presented at the ADIPEC, October 31–November 3, 2022
Paper Number: SPE-211553-MS
... acceptance criteria Introduction This paper provides an overview of the completion technology development journey that enabled a well operator to move from a two-trip to a single-trip completion solution for ERD wells of more than 45,000 ft MD. Upper completion technology was developed specifically...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 15–18, 2021
Paper Number: SPE-207579-MS
... was performed for the stack cladding. As this analysis was non-conventional, there is no well-established industry acceptance criteria for the analysis results. Hence, an acceptance criteria was jointly developed with Contractor, which is fundamentally the minimum number of screws per panel, required...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 11–14, 2019
Paper Number: SPE-197707-MS
... of fire, fire duration, heat flux, rupture acceptance criteria, in addition to inputs considered in conventional approach. Emergency depressurization rate in FRA Study is established based on adequacy of ultimate material tensile strength against the stresses developed under fire scenario. In house case...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-192665-MS
... of PWHT shall be evaluated by demonstrating an alternate method using fracture mechanics duly supplemented with engineering assessment. Results from the case study substantiated by detailed engineering critically assessment (ECA) show that the acceptance criteria can be achieved without the requirement...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 12–15, 2018
Paper Number: SPE-193158-MS
... based on realistic data or assumptions and best practice engineering tools as well. Unfortunately, both data and interpretative models are affected by uncertainties, subjective interpretations as well. About acceptance criteria, international codes recently introduced safety targets applicable...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188615-MS
... Abstract There is an absence of industry-wide, globally accepted standards that provide comprehensive inspection procedures and acceptance criteria for inspection and maintenance of drilling bits, including: wear, cracking, and mechanical damage criteria for bit bodies and cutting elements...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, November 13–16, 2017
Paper Number: SPE-188300-MS
... Management sour service contractor operator Upstream Oil & Gas pipe wall steel Acceptance Criteria hydrogen partial pressure Welding Introduction It is not new that internal corrosion may be of major concern for field development projects. Actually, what is noteworthy is the large...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 9–12, 2015
Paper Number: SPE-177795-MS
... and developed an Internal Commissioning & Hand over strategy as follows: At FEED stage of the project, all Commissioning requirments, Start-Up sequence, Performance Test Run requirements & Acceptance criteria are identified and ensured that the same are embedded in EPC scope of work. At early stage...
Proceedings Papers

Paper presented at the Abu Dhabi International Petroleum Exhibition and Conference, November 1–4, 2010
Paper Number: SPE-138712-MS
... In order, therefore, to meet the objective of „consistent minimum reliability (against environmental overload) for offshore platforms around the world’ one possible approach is to specify acceptance criteria that are regionally specific i.e. acceptance criteria that take account of the slope...

Product(s) added to cart

Close Modal